This report provides a representative set of detailed use case scenarios for Connected and Automated Mobility (CAM) with appropriate requirements to be tested and validated both in lab and in large-scale field trials across borders. The document summarizes the work done by the partners to define use cases, scenarios and KPIs applicable to 5G Connected and Automated Mobility trials. 5G-ROUTES stakeholders come from different companies and have a different background and interest in the project. We have first analysed their characteristics and identified 4 categories of stakeholders: The telecom category contains large telecom manufacturers and operators; within the transport category, railway operators are supporting future railway mobile co...
The future fifth generation (5G) mobile networks will support a number of use cases such as extreme ...
The fifth mobile communications generation (5G) can lead to a substantial change in companies enabli...
The aim of deliverable 1.3 is to summarise 5G-ROUTES CAM deployment plan giving a snapshot view of a...
This report provides 5G-ROUTES initial analysis of Connected and Automated Mobility (CAM) standards ...
Fifth-generation (5G) mobile networks aim to be qualified as the core connectivity infrastructures t...
The aim of this project is to conduct advanced field trials of most representative and innovative Co...
The objective of 5G-ROUTES project is to conduct 5th generation connected and automated mobility cro...
Being 5G-ROUTES a Phase-3 5G-PPP project, one of its objectives is to provide a practical and novel ...
The 5GMED project will demonstrate advanced Cooperative, Connected and Automated Mobility (CCAM) and...
The mobile demands and future business context are anticipated to be resolved by the fifth-generatio...
The 5GCroCo project conducted large-scale trials of 5G technologies for Connected and Automated Mobi...
The fifth generation of wireless networks (5G) is not just an evolutionary upgrade of the previous g...
Connected and Automated Mobility (CAM) and Future Railway Mobile Communications System (FRMCS) use c...
Part 1: 6th Workshop on “5G – Putting Intelligence to the Network Edge” (5G-PINE 2021)International ...
Data travels across multiple system architectures to supply Cooperative, Connected and Automated Mob...
The future fifth generation (5G) mobile networks will support a number of use cases such as extreme ...
The fifth mobile communications generation (5G) can lead to a substantial change in companies enabli...
The aim of deliverable 1.3 is to summarise 5G-ROUTES CAM deployment plan giving a snapshot view of a...
This report provides 5G-ROUTES initial analysis of Connected and Automated Mobility (CAM) standards ...
Fifth-generation (5G) mobile networks aim to be qualified as the core connectivity infrastructures t...
The aim of this project is to conduct advanced field trials of most representative and innovative Co...
The objective of 5G-ROUTES project is to conduct 5th generation connected and automated mobility cro...
Being 5G-ROUTES a Phase-3 5G-PPP project, one of its objectives is to provide a practical and novel ...
The 5GMED project will demonstrate advanced Cooperative, Connected and Automated Mobility (CCAM) and...
The mobile demands and future business context are anticipated to be resolved by the fifth-generatio...
The 5GCroCo project conducted large-scale trials of 5G technologies for Connected and Automated Mobi...
The fifth generation of wireless networks (5G) is not just an evolutionary upgrade of the previous g...
Connected and Automated Mobility (CAM) and Future Railway Mobile Communications System (FRMCS) use c...
Part 1: 6th Workshop on “5G – Putting Intelligence to the Network Edge” (5G-PINE 2021)International ...
Data travels across multiple system architectures to supply Cooperative, Connected and Automated Mob...
The future fifth generation (5G) mobile networks will support a number of use cases such as extreme ...
The fifth mobile communications generation (5G) can lead to a substantial change in companies enabli...
The aim of deliverable 1.3 is to summarise 5G-ROUTES CAM deployment plan giving a snapshot view of a...