Concurrent planning of the resource constraint project scheduling and material ordering problems have received significant attention within the last decades. Hence, the issue has been investigated here with the aim to minimize total project costs. Furthermore, the presented model considers different discount options in order to approach the real world conditions. The incorporated alternatives consist of all-unit and incremental discount strategies. On the other hand, a modified version of the genetic algorithm is applied in order to solve the model for larger sizes, in particular. Finally, the applicability and efficiency of the given model is tested by different numerical instances
This manuscript focuses on the single- and multi-mode resource-constrained project scheduling proble...
Concurrent planning of project scheduling and material ordering has been increasingly addressed with...
In this paper we consider the resource-constrained project scheduling problem with multiple executio...
<p>Simultaneous planning of project scheduling and material procurement can improve the project exec...
In this study, the integration of total quantity discount policy in materials procurement of a proje...
Minimizing the costs in a project is highly tied with the way the required resources are provided. T...
This study aims to deal with a more realistic combined problem of project scheduling and material or...
This study emphasizes that project scheduling and material ordering (time and quantity of an order) ...
© 2014 Taylor & Francis. In this paper, we discuss the resource-constrained project scheduling pro...
This article considers the multicriteria optimization approach using the modified genetic algorithm ...
159 p.Project scheduling has a tremendous effect on the performance of a construction project. In pr...
International audienceDuring the last decades, resource-constrained project scheduling problems have...
Traditionally, project scheduling and material planning have been treated independently. In this res...
Due to uncertainty in both demand and supply, material shortages are difficult to completely avoid. ...
Scarce resources may cause delay in completion of a project on time. In this research, a multi-objec...
This manuscript focuses on the single- and multi-mode resource-constrained project scheduling proble...
Concurrent planning of project scheduling and material ordering has been increasingly addressed with...
In this paper we consider the resource-constrained project scheduling problem with multiple executio...
<p>Simultaneous planning of project scheduling and material procurement can improve the project exec...
In this study, the integration of total quantity discount policy in materials procurement of a proje...
Minimizing the costs in a project is highly tied with the way the required resources are provided. T...
This study aims to deal with a more realistic combined problem of project scheduling and material or...
This study emphasizes that project scheduling and material ordering (time and quantity of an order) ...
© 2014 Taylor & Francis. In this paper, we discuss the resource-constrained project scheduling pro...
This article considers the multicriteria optimization approach using the modified genetic algorithm ...
159 p.Project scheduling has a tremendous effect on the performance of a construction project. In pr...
International audienceDuring the last decades, resource-constrained project scheduling problems have...
Traditionally, project scheduling and material planning have been treated independently. In this res...
Due to uncertainty in both demand and supply, material shortages are difficult to completely avoid. ...
Scarce resources may cause delay in completion of a project on time. In this research, a multi-objec...
This manuscript focuses on the single- and multi-mode resource-constrained project scheduling proble...
Concurrent planning of project scheduling and material ordering has been increasingly addressed with...
In this paper we consider the resource-constrained project scheduling problem with multiple executio...