In 2019 the LHCb experiment will go through an important upgrade, that will improve performance in many fields. One oh these fields is the DAQ system: it consists of a big flow of data that comes from the network and reaches a set of disks, where data are stored. This flow of data needs to be placed on the hardware in order to optimize the performance: high bandwidth and low CPU utilization are two key ingredients to achieve this goal. The first part of this project is about this: we realize a very basic test setup, consisting of two servers connected through a 100 Gbit/s Ethernet Interface and we optimize the data transfer in terms of bandwidth and CPU utilization. In the second part a set of disks is connected to one of the two servers, i...
The goal of the LHCb readout upgrade is to speed up the DAQ to 40 MHz. Such a DAQ system will certai...
The goal of the LHCb readout upgrade is to accelerate the DAQ to 40 MHz. Such a DAQ system will cert...
The LHCb Data Acquisition (DAQ) will be upgraded in 2020 to a trigger-free readout. In order to achi...
The LHCb experiment[1] is preparing a major upgrade resulting in a need for a high-end network for a...
The LHCb experiment [1] will be upgraded in 2018–2019 to change its operation to a triggerless full-...
The LHCb experiment is preparing a major upgrade, during long shutdown 2 in 2018, of both the detect...
The LHCb experiment is preparing a major upgrade, during long shutdown 2 in 2018, of both the detect...
Project Specification The experiments at CERN generate mountainous amounts of data. In the first ru...
The LHCb data acquisition system is realized as a Gigabit Ethernet local area network with more than...
LHCb will have an upgrade of its detector in 2018. After the upgrade, the LHCb experiment will run a...
LHCb will have an upgrade of its detector in 2018. After the upgrade, the LHCb experiment will run a...
During the Long Shutdown 2 (2018-2019) the LHCb experiment will be upgraded in order to reach extrem...
This document first analyses the performance of Gigabit Ethernet Network Interface Cards, in the way...
The ATLAS experiment Data Acquisition (DAQ) system will face an extensive upgrade to fully exploit t...
Commercially available high performance Gigabit Ethernet (GbE) switches are optimized mostly for Int...
The goal of the LHCb readout upgrade is to speed up the DAQ to 40 MHz. Such a DAQ system will certai...
The goal of the LHCb readout upgrade is to accelerate the DAQ to 40 MHz. Such a DAQ system will cert...
The LHCb Data Acquisition (DAQ) will be upgraded in 2020 to a trigger-free readout. In order to achi...
The LHCb experiment[1] is preparing a major upgrade resulting in a need for a high-end network for a...
The LHCb experiment [1] will be upgraded in 2018–2019 to change its operation to a triggerless full-...
The LHCb experiment is preparing a major upgrade, during long shutdown 2 in 2018, of both the detect...
The LHCb experiment is preparing a major upgrade, during long shutdown 2 in 2018, of both the detect...
Project Specification The experiments at CERN generate mountainous amounts of data. In the first ru...
The LHCb data acquisition system is realized as a Gigabit Ethernet local area network with more than...
LHCb will have an upgrade of its detector in 2018. After the upgrade, the LHCb experiment will run a...
LHCb will have an upgrade of its detector in 2018. After the upgrade, the LHCb experiment will run a...
During the Long Shutdown 2 (2018-2019) the LHCb experiment will be upgraded in order to reach extrem...
This document first analyses the performance of Gigabit Ethernet Network Interface Cards, in the way...
The ATLAS experiment Data Acquisition (DAQ) system will face an extensive upgrade to fully exploit t...
Commercially available high performance Gigabit Ethernet (GbE) switches are optimized mostly for Int...
The goal of the LHCb readout upgrade is to speed up the DAQ to 40 MHz. Such a DAQ system will certai...
The goal of the LHCb readout upgrade is to accelerate the DAQ to 40 MHz. Such a DAQ system will cert...
The LHCb Data Acquisition (DAQ) will be upgraded in 2020 to a trigger-free readout. In order to achi...