In this deliverable D5.8 the final version of the 5G EVE testing and validation platform is presented, focusing on the components of the platform which are related with the execution of the experiment, the analysis of the collected metrics, the validation of the generated KPIs and finally the generation of the final reports provided to the experimenters for the use case data analysis. The key 5G EVE components which are related with the experiment execution, the analysis and validation of the results and the diagnostic functionalities and they were defined and developed in the project are the “Experiment Execution Manager”, the “Results Analysis and Validation” and the “Performance Diagnosis”. Together with these three components, also a “...
[Deliverable pending final approval by the EC] The present document is deliverable D5.1 ‘Initial val...
This deliverable presents the WP5 activities on the integration and testing of the Coordination Laye...
This document is the third technical deliverable of the 5GENESIS project, and contains work conducte...
The main objective of 5G EVE WP5 is the design and development of a testing and validation framework...
In deliverable D5.9, the user manual of the final 5G EVE testing and validation methodology and fram...
The 5G EVE Experimentation Portal is the main visible component available for experimenters willing ...
The present deliverable is the Initial report about the first functional tests and 5G end to end fac...
The adoption of 5G has recently picked up pace and across the globe commercial deployments are more ...
This document presents the final version of the 5G EVE experimental Portal. It describes all service...
This deliverable presents the second cycle of trials and experimentation activities executed over 5G...
5G carries out a shift in the way the mobile service is delivered, going beyond current broadband us...
This deliverable provides a first release of the 5G EVE portal tools for the design, specification, ...
The main objective of this deliverable is to describe the final status of the 5G EVE facility in ter...
[Deliverable pending final approval by the EC]. D5.2 ‘Validation methodology’ of the 5G-IANA project...
The presentation outlines project 5G EVE, which supports the fundamental transition to the future 5G...
[Deliverable pending final approval by the EC] The present document is deliverable D5.1 ‘Initial val...
This deliverable presents the WP5 activities on the integration and testing of the Coordination Laye...
This document is the third technical deliverable of the 5GENESIS project, and contains work conducte...
The main objective of 5G EVE WP5 is the design and development of a testing and validation framework...
In deliverable D5.9, the user manual of the final 5G EVE testing and validation methodology and fram...
The 5G EVE Experimentation Portal is the main visible component available for experimenters willing ...
The present deliverable is the Initial report about the first functional tests and 5G end to end fac...
The adoption of 5G has recently picked up pace and across the globe commercial deployments are more ...
This document presents the final version of the 5G EVE experimental Portal. It describes all service...
This deliverable presents the second cycle of trials and experimentation activities executed over 5G...
5G carries out a shift in the way the mobile service is delivered, going beyond current broadband us...
This deliverable provides a first release of the 5G EVE portal tools for the design, specification, ...
The main objective of this deliverable is to describe the final status of the 5G EVE facility in ter...
[Deliverable pending final approval by the EC]. D5.2 ‘Validation methodology’ of the 5G-IANA project...
The presentation outlines project 5G EVE, which supports the fundamental transition to the future 5G...
[Deliverable pending final approval by the EC] The present document is deliverable D5.1 ‘Initial val...
This deliverable presents the WP5 activities on the integration and testing of the Coordination Laye...
This document is the third technical deliverable of the 5GENESIS project, and contains work conducte...