The main objective of this document is to elaborate a synthesized report, for each CHESS-SETUP pilot experience, where data obtained from the monitoring and control system are compared with theoretical data obtained from the simulations. For Lavola Ecoedifici and Sant Cugat Sports Centre, the empirical values were obtained from the monitoring and control system implemented in these two pilots, described in the deliverable ‘4.2 Management tool’. For Corby’s dwellings, the implemented solution has its own control system and the empirical values were obtained from this one. The theoretical values for each pilot are those obtained in the simulations performed in the deliverable ‘D3.7Pilot’s experience report’ and those calculated in the deliv...
Building management systems can be either fully automatic or can be effected manually by the buildin...
In closed-loop control tasks (e.g., flying), the human operator is required to continuously monitor ...
Developing a transport system meeting the requirement of seamless door-to-door travel as envisioned ...
The monitoring and visualization is a very important component of any system since what is not measu...
This report provides a Tool for managing the technical and economic operation of the system. The mo...
The monitoring and visualization is a very important component of any system since what is not measu...
The aim of this report is to provide the evidences of the construction progress for the three pilot ...
This report presents the realisation of the IT applications of the four pilot sites of the GATE proj...
This deliverable describes the first pool of simulation results covering nine representative pilot s...
In the building industry, the quality control practices during the design stage, implementation, int...
The “Monitoring results from the Pilot and real demo sites” is a confidential document delivered in ...
The thesis acquaints the reader with the matter of data collection from the measurement and control ...
The present air traffic is expected to reached its capacity limit and thus may not be able to accomm...
The present document will introduce the very essence of the project and its engineering process. Bes...
The deliverable D8.1, “Piloting Plan”, aims to give a general scope of the activities that will be u...
Building management systems can be either fully automatic or can be effected manually by the buildin...
In closed-loop control tasks (e.g., flying), the human operator is required to continuously monitor ...
Developing a transport system meeting the requirement of seamless door-to-door travel as envisioned ...
The monitoring and visualization is a very important component of any system since what is not measu...
This report provides a Tool for managing the technical and economic operation of the system. The mo...
The monitoring and visualization is a very important component of any system since what is not measu...
The aim of this report is to provide the evidences of the construction progress for the three pilot ...
This report presents the realisation of the IT applications of the four pilot sites of the GATE proj...
This deliverable describes the first pool of simulation results covering nine representative pilot s...
In the building industry, the quality control practices during the design stage, implementation, int...
The “Monitoring results from the Pilot and real demo sites” is a confidential document delivered in ...
The thesis acquaints the reader with the matter of data collection from the measurement and control ...
The present air traffic is expected to reached its capacity limit and thus may not be able to accomm...
The present document will introduce the very essence of the project and its engineering process. Bes...
The deliverable D8.1, “Piloting Plan”, aims to give a general scope of the activities that will be u...
Building management systems can be either fully automatic or can be effected manually by the buildin...
In closed-loop control tasks (e.g., flying), the human operator is required to continuously monitor ...
Developing a transport system meeting the requirement of seamless door-to-door travel as envisioned ...