In this paper, we demonstrate an analytical model for computing the end-to-end packet delay of a converged optical/wireless 60 GHz Radio-over-Fiber (RoF) network operating under the medium-transparent MAC (MT-MAC) protocol. For the calculation of the cycle times, this model considers the protocol time consumed for contention and data exchange over both optical and wireless media, a feature of the MT-MAC that effectively enables it to provide direct and seamless interaction between the RoF Central Office and the end users. This new analytical model enables us to conduct an extensive delay performance analysis of the various performance aspects of hybrid RoF networks operating under the fixed service paradigm, such as various optical capacity...
We present a novel client-weighted medium-transparent medium access control (CW-MT-MAC) protocol wit...
The convergence of fiber and wireless systems based on millimiter-wave (mmWave) bands seems to be a ...
© 2016 [2016 Optical Society of America.]. One print or electronic copy may be made for personal use...
©2017 IEEE. Personal use of this material is permitted. Permission from IEEE must be obtained for al...
©2017 IEEE. Personal use of this material is permitted. Permission from IEEE must be obtained for al...
We demonstrate for the first time an analytical model for computing the end to end packet delay of a...
Fifth Generation (5G) Cloud-Radio Access Networks (C-RANs) are about to exploit both optical and Mil...
Abstract—We demonstrate an analytical model for calculating the saturation throughput performance of...
We demonstrate an analytical model for calculating the saturation throughput performance of a medium...
This paper describes and summarizes the notion of medium-transparency in the access control protocol...
We demonstrate for the first time an analytical model for computing the saturation throughput of a M...
Next generation, i.e., fifth generation (5G), networks will leverage both fiber and wireless (FiWi) ...
In order to meet the ever-increasing 5G and beyond Radio Access Network (RAN) densification demands,...
We demonstrate a novel Medium-Transparent MAC (MT-MAC) protocol with enhanced end-user service deliv...
We present a novel client-weighted medium-transparent medium access control (CW-MT-MAC) protocol wit...
We present a novel client-weighted medium-transparent medium access control (CW-MT-MAC) protocol wit...
The convergence of fiber and wireless systems based on millimiter-wave (mmWave) bands seems to be a ...
© 2016 [2016 Optical Society of America.]. One print or electronic copy may be made for personal use...
©2017 IEEE. Personal use of this material is permitted. Permission from IEEE must be obtained for al...
©2017 IEEE. Personal use of this material is permitted. Permission from IEEE must be obtained for al...
We demonstrate for the first time an analytical model for computing the end to end packet delay of a...
Fifth Generation (5G) Cloud-Radio Access Networks (C-RANs) are about to exploit both optical and Mil...
Abstract—We demonstrate an analytical model for calculating the saturation throughput performance of...
We demonstrate an analytical model for calculating the saturation throughput performance of a medium...
This paper describes and summarizes the notion of medium-transparency in the access control protocol...
We demonstrate for the first time an analytical model for computing the saturation throughput of a M...
Next generation, i.e., fifth generation (5G), networks will leverage both fiber and wireless (FiWi) ...
In order to meet the ever-increasing 5G and beyond Radio Access Network (RAN) densification demands,...
We demonstrate a novel Medium-Transparent MAC (MT-MAC) protocol with enhanced end-user service deliv...
We present a novel client-weighted medium-transparent medium access control (CW-MT-MAC) protocol wit...
We present a novel client-weighted medium-transparent medium access control (CW-MT-MAC) protocol wit...
The convergence of fiber and wireless systems based on millimiter-wave (mmWave) bands seems to be a ...
© 2016 [2016 Optical Society of America.]. One print or electronic copy may be made for personal use...