The long-standing issue of non-pre-emption in ‘multi-period’ production/maintenance (P/M) scheduling has always been a challenge and this has been the focus of many researchers. Recently, the Contiguous-Cells Transportation Model (CCTM) was proposed to address this problem. However, the CCTM is limited to non-pre-emptive P/M scheduling decision situations where only one objective is of concern. The multiple objective non-pre-emptive P/M scheduling are encountered more frequently in the real world than the single objective case. This study proposed the Multi-Objective Contiguous-Cells Transportation Model (MOCCTM) and the solution procedure for handling multi-objective cases of non-pre-emptive production/maintenance scheduling. The variables...
We present a multi-objective finite-capacity production scheduling algorithm for an integrated steel...
Abstract: "Production planning and scheduling are intimately linked activities. Since the production...
Considering the trade-offs between conflicting objectives in project scheduling problems (PSPs) is a...
The issue of scheduling a long string of multi-period activities which have to be completed without ...
Abstract—The issue of scheduling a long string of multi-period activities which have to be completed...
Purpose of this paper To optimize production schedules of a real production cell containing multi-pu...
This paper presents an algorithm based on Ant Colony Optimization paradigm to solve the joint produc...
<p>Intercell moves are caused by exceptional parts which need to be processed in multiple cells. Int...
In recent years, decision makers give more im- portance to the maintenance function, viewing its sub...
This study investigates the simultaneous scheduling of production and planning of maintenance activi...
This article investigates a JIT single machine scheduling problem with a periodic preventive mainten...
International audienceThis paper deals with the joint production and maintenance scheduling problem ...
Today’s globalized business environment has brought about new and greater challenges to manufacturer...
International audienceIn order to solve the on-line problem we consider that the scheduler will act ...
Different industries compete to attract customers in different ways. In the field of production, gro...
We present a multi-objective finite-capacity production scheduling algorithm for an integrated steel...
Abstract: "Production planning and scheduling are intimately linked activities. Since the production...
Considering the trade-offs between conflicting objectives in project scheduling problems (PSPs) is a...
The issue of scheduling a long string of multi-period activities which have to be completed without ...
Abstract—The issue of scheduling a long string of multi-period activities which have to be completed...
Purpose of this paper To optimize production schedules of a real production cell containing multi-pu...
This paper presents an algorithm based on Ant Colony Optimization paradigm to solve the joint produc...
<p>Intercell moves are caused by exceptional parts which need to be processed in multiple cells. Int...
In recent years, decision makers give more im- portance to the maintenance function, viewing its sub...
This study investigates the simultaneous scheduling of production and planning of maintenance activi...
This article investigates a JIT single machine scheduling problem with a periodic preventive mainten...
International audienceThis paper deals with the joint production and maintenance scheduling problem ...
Today’s globalized business environment has brought about new and greater challenges to manufacturer...
International audienceIn order to solve the on-line problem we consider that the scheduler will act ...
Different industries compete to attract customers in different ways. In the field of production, gro...
We present a multi-objective finite-capacity production scheduling algorithm for an integrated steel...
Abstract: "Production planning and scheduling are intimately linked activities. Since the production...
Considering the trade-offs between conflicting objectives in project scheduling problems (PSPs) is a...