The major aim of Work Package 10 (WP10) ‘Advancing the Operational Infrastructure’ is promoting the software technology and services needed for the operation of the integrated infrastructure inherited from the DEISA project and the PRACE preparatory phase. After finalization of the PRACE-1IP project, WP10 is also continuing the work of the technology task T6.3 of the work package WP6 of PRACE-1IP. This activity is split into three tasks which cover different aspects of the goal to be achieved. The first one is focused on the existing infrastructure. The second one concentrates on data services, which go beyond the already existing ones, because access to data is an essential need for all scientists doing computations within PRACE. The third...
The DECI programme for high-end scientific projects in HPC was started in 2005 by the EC-funded DEIS...
This deliverable presents the existing and new activities between PRACE and complementary e-Infrastr...
Task T7.1 “Applications Enabling Services on PRACE Systems” in Work Package 7 (WP7) of PRACE-5IP aim...
The major aim of Work Package 10 (WP10) Advancing the Operational Infrastructure in PRACE-2IP is ass...
Task 6.3 ‘Technical evolution of the PRACE operational services’ in Work Package 6 ‘Operation of the...
Since the start of the PRACE-1IP project in July 2010 the Tier-0 service at FZJ in Germany has been ...
The primary objective of WP6 ‘European HPC Infrastructure Operation and Evolution’ in PRACE-2IP is t...
The main objective of WP6 is the operation of an infrastructure of national HPC Tier-1 systems in Eu...
Task 6.3 ‘Technical evolution of the PRACE operational services’ in work package 6 ‘Operation of the...
This document, the “First Annual Report of WP2”, of the PRACE Second Implementation Project (PRACE-2...
The objective of this report is to present the work that has been done in year 2 of the PRACE-1IP pr...
This document, the “Second Annual Report of WP2”, of the PRACE Second Implementation Phase Project (...
The objective of this deliverable is to present the activity done in the reporting period (January 2...
The objective of this report is to present the work that has been done in year one by work package 6...
This document is the dissemination, outreach and liaison activities report, report on 1st period act...
The DECI programme for high-end scientific projects in HPC was started in 2005 by the EC-funded DEIS...
This deliverable presents the existing and new activities between PRACE and complementary e-Infrastr...
Task T7.1 “Applications Enabling Services on PRACE Systems” in Work Package 7 (WP7) of PRACE-5IP aim...
The major aim of Work Package 10 (WP10) Advancing the Operational Infrastructure in PRACE-2IP is ass...
Task 6.3 ‘Technical evolution of the PRACE operational services’ in Work Package 6 ‘Operation of the...
Since the start of the PRACE-1IP project in July 2010 the Tier-0 service at FZJ in Germany has been ...
The primary objective of WP6 ‘European HPC Infrastructure Operation and Evolution’ in PRACE-2IP is t...
The main objective of WP6 is the operation of an infrastructure of national HPC Tier-1 systems in Eu...
Task 6.3 ‘Technical evolution of the PRACE operational services’ in work package 6 ‘Operation of the...
This document, the “First Annual Report of WP2”, of the PRACE Second Implementation Project (PRACE-2...
The objective of this report is to present the work that has been done in year 2 of the PRACE-1IP pr...
This document, the “Second Annual Report of WP2”, of the PRACE Second Implementation Phase Project (...
The objective of this deliverable is to present the activity done in the reporting period (January 2...
The objective of this report is to present the work that has been done in year one by work package 6...
This document is the dissemination, outreach and liaison activities report, report on 1st period act...
The DECI programme for high-end scientific projects in HPC was started in 2005 by the EC-funded DEIS...
This deliverable presents the existing and new activities between PRACE and complementary e-Infrastr...
Task T7.1 “Applications Enabling Services on PRACE Systems” in Work Package 7 (WP7) of PRACE-5IP aim...