This document constitutes the Deliverable D4.2 "Demonstration Execution Plan, C-REL" of the IP4MaaS Project. It delivers a detailed plan for the preparation and execution of the C-REL phase of the demonstrations. D4.2 provides: • A meaningful roadmap based on the work done by WP2 and WP3 of the project and specifically deliverables D2.1, D2.2, D3.1, while also complemented by and complementing D3.2. • An overview of the technologies of the IP4 Ecosystem that are available for the 1st Phase of the Demonstrations, as well as those under development for utilization in the 2nd Phase. • Information regarding the available solutions and the in-house development of the operators in C-REL. • The representative travel solutions and use cases for the...
Deliverable D3.1 List of operational KPIs, analysis of the users’ satisfaction, and methodology as a...
The aim of this deliverable is to provide context for the CAPABLE system demonstration video. A brie...
The aim of this deliverable is to support and provide context to the CAPABLE system demonstration vi...
This document constitutes the Deliverable D4.3 "Demonstration Execution Plan, F-REL" of the IP4MaaS ...
This document provides: • A detailed description of the methodology adopted by the IP4MaaS project f...
The IP4MaaS project aims to plan and conduct demonstrations in Athens, Barcelona, Liberec, Osijek, P...
This document has been prepared to provide a plan for the technical integration of the services that...
This document has been prepared to provide a plan for the technical integration of the services that...
This document provides: • A detailed description of the methodology adopted by the IP4MaaS project f...
The present document constitutes the Deliverable D3.2 “List of operational KPIs, analysis of the use...
The purpose of this deliverable is to plan the specific demonstration activities and to ensure that ...
The present document constitutes the Deliverable D3.2 “List of operational KPIs, analysis of the use...
Deliverable D3.1 List of operational KPIs, analysis of the users’ satisfaction, and methodology as a...
This document constitutes deliverable D2.1 “Technology Survey, C-REL” of the IP4MaaS project. The ma...
The present document is a deliverable of the AI4DI project, which is co-funded by the ECSEL Joint Un...
Deliverable D3.1 List of operational KPIs, analysis of the users’ satisfaction, and methodology as a...
The aim of this deliverable is to provide context for the CAPABLE system demonstration video. A brie...
The aim of this deliverable is to support and provide context to the CAPABLE system demonstration vi...
This document constitutes the Deliverable D4.3 "Demonstration Execution Plan, F-REL" of the IP4MaaS ...
This document provides: • A detailed description of the methodology adopted by the IP4MaaS project f...
The IP4MaaS project aims to plan and conduct demonstrations in Athens, Barcelona, Liberec, Osijek, P...
This document has been prepared to provide a plan for the technical integration of the services that...
This document has been prepared to provide a plan for the technical integration of the services that...
This document provides: • A detailed description of the methodology adopted by the IP4MaaS project f...
The present document constitutes the Deliverable D3.2 “List of operational KPIs, analysis of the use...
The purpose of this deliverable is to plan the specific demonstration activities and to ensure that ...
The present document constitutes the Deliverable D3.2 “List of operational KPIs, analysis of the use...
Deliverable D3.1 List of operational KPIs, analysis of the users’ satisfaction, and methodology as a...
This document constitutes deliverable D2.1 “Technology Survey, C-REL” of the IP4MaaS project. The ma...
The present document is a deliverable of the AI4DI project, which is co-funded by the ECSEL Joint Un...
Deliverable D3.1 List of operational KPIs, analysis of the users’ satisfaction, and methodology as a...
The aim of this deliverable is to provide context for the CAPABLE system demonstration video. A brie...
The aim of this deliverable is to support and provide context to the CAPABLE system demonstration vi...