But school buildings are different from residential buildings. Therefore the attempt make only airtight and well insulated building envelope is not sufficient, because this one-sided approach forces a false user behaviour which partly wrecks the target energy savings and environmental protection again. During the school year 2006/2007 environment measurements (energy consumption, IAQ, acustics, etc) were carried in a school closed to Munich and an integral retrofitting strategy was developed. For the first time all relevant, not only energy saving, factors were taken into the account. A special focus was laid on the future student performance.Presenters: name: Andreas Holm affiliation: (Fraunhoferstr. 10) email: holm@hoki.ibp.fhg.d
The ECBCS Annex 36 "Retrofitting of Educational Buildings - REDUCE - Energy Concept Adviser for Tech...
Educational buildings could play leading roles in increasing high-performance building refurbishment...
AbstractThe objective of this work is to develop an overview on the available building and system re...
International studies, like the PISA study [PISA 2006], detect the performance of pupils. Besides th...
The aim of the "School of the Future" project (www.school-of-the-future.eu), which receives funding ...
AbstractThe amount of delivered energy used by educational buildings is equal to approx. 20 million ...
The amount of delivered energy used by educational buildings is equal to approx. 20 million MWh/a, a...
In 2011, the 'School of the Future' project was launched as a demonstration project in the Seventh F...
Retrofitting of school does not only offering the chance to improve the energy efficiency of school ...
Within the existing building stock, schools occupy a large segment of public real estate but are rar...
Indoor Environmental Quality (IEQ) is a crucial issue in school buildings, because of the conditions...
AbstractEvery year governments of the European Member States invest several billion Euros in mainten...
The energy efficient renovation of the Solitude-Gymnasium in Stuttgart is one of the 4 demonstration...
At a time when major climate change and aspiration for sustainable economic and social development h...
AbstractThe Tito Maccio Plauto school was built in Cesena during late sixties and, conformingly to t...
The ECBCS Annex 36 "Retrofitting of Educational Buildings - REDUCE - Energy Concept Adviser for Tech...
Educational buildings could play leading roles in increasing high-performance building refurbishment...
AbstractThe objective of this work is to develop an overview on the available building and system re...
International studies, like the PISA study [PISA 2006], detect the performance of pupils. Besides th...
The aim of the "School of the Future" project (www.school-of-the-future.eu), which receives funding ...
AbstractThe amount of delivered energy used by educational buildings is equal to approx. 20 million ...
The amount of delivered energy used by educational buildings is equal to approx. 20 million MWh/a, a...
In 2011, the 'School of the Future' project was launched as a demonstration project in the Seventh F...
Retrofitting of school does not only offering the chance to improve the energy efficiency of school ...
Within the existing building stock, schools occupy a large segment of public real estate but are rar...
Indoor Environmental Quality (IEQ) is a crucial issue in school buildings, because of the conditions...
AbstractEvery year governments of the European Member States invest several billion Euros in mainten...
The energy efficient renovation of the Solitude-Gymnasium in Stuttgart is one of the 4 demonstration...
At a time when major climate change and aspiration for sustainable economic and social development h...
AbstractThe Tito Maccio Plauto school was built in Cesena during late sixties and, conformingly to t...
The ECBCS Annex 36 "Retrofitting of Educational Buildings - REDUCE - Energy Concept Adviser for Tech...
Educational buildings could play leading roles in increasing high-performance building refurbishment...
AbstractThe objective of this work is to develop an overview on the available building and system re...