In this deliverable, we present results obtained in Task 6.2 of Work package 6 of PRACE-4IP project. This task was focused to four new services that had potential to address some of the widely recognised needs in scientific computing: (i) providing protocols, policies and infrastructure for applications that need to be run in urgent situations, like flooding, fires etc.; (ii) establishing fast and reliable links between large scale scientific instruments and HPC centres from PRACE for fast and efficient data transfer; (iii) providing smart visualization tools, including guidelines, manuals and solutions for remote and in-situ data visualization; and (iv) providing repositories for European open source scientific libraries and applications, ...
In 2005 and 2006, an international panel produced a White Paper entitled ‘Scientific Case for a Euro...
This deliverable reports about the installation and the operation of the three prototypes delivered ...
The major aim of Work Package 10 (WP10) Advancing the Operational Infrastructure in PRACE-2IP is ass...
In this deliverable, we present results obtained in Task 6.2 of Work Package 6 of the PRACE-5IP proj...
This document presents the work done within Task 6.2 by middle of September 2017. This task aims to ...
Since the start of the PRACE-1IP project in July 2010 the Tier-0 service at FZJ in Germany has been ...
The objective of this deliverable is to present the activity done to operate and coordinate the comm...
Task 6.3 ‘Technical evolution of the PRACE operational services’ in Work Package 6 ‘Operation of the...
The objective of this deliverable is to present the activity done in the reporting period (May 2019 ...
The objective of this deliverable is to present the activity done in the reporting period (February ...
Task 6.3 ‘Technical evolution of the PRACE operational services’ in work package 6 ‘Operation of the...
This deliverable is an update of the PRACE-4IP deliverable D2.1 “First Report on PRACE 2.0 Developme...
Task T7.1 “Applications Enabling Services on PRACE Systems” in Work Package 7 (WP7) of PRACE-5IP aim...
Task T7.1 “Applications Enabling Services on PRACE Systems” in Work Package 7 (WP7) of PRACE-5IP aim...
This deliverable reports on four main activities of Work Package 2 (WP2) during the first reporting ...
In 2005 and 2006, an international panel produced a White Paper entitled ‘Scientific Case for a Euro...
This deliverable reports about the installation and the operation of the three prototypes delivered ...
The major aim of Work Package 10 (WP10) Advancing the Operational Infrastructure in PRACE-2IP is ass...
In this deliverable, we present results obtained in Task 6.2 of Work Package 6 of the PRACE-5IP proj...
This document presents the work done within Task 6.2 by middle of September 2017. This task aims to ...
Since the start of the PRACE-1IP project in July 2010 the Tier-0 service at FZJ in Germany has been ...
The objective of this deliverable is to present the activity done to operate and coordinate the comm...
Task 6.3 ‘Technical evolution of the PRACE operational services’ in Work Package 6 ‘Operation of the...
The objective of this deliverable is to present the activity done in the reporting period (May 2019 ...
The objective of this deliverable is to present the activity done in the reporting period (February ...
Task 6.3 ‘Technical evolution of the PRACE operational services’ in work package 6 ‘Operation of the...
This deliverable is an update of the PRACE-4IP deliverable D2.1 “First Report on PRACE 2.0 Developme...
Task T7.1 “Applications Enabling Services on PRACE Systems” in Work Package 7 (WP7) of PRACE-5IP aim...
Task T7.1 “Applications Enabling Services on PRACE Systems” in Work Package 7 (WP7) of PRACE-5IP aim...
This deliverable reports on four main activities of Work Package 2 (WP2) during the first reporting ...
In 2005 and 2006, an international panel produced a White Paper entitled ‘Scientific Case for a Euro...
This deliverable reports about the installation and the operation of the three prototypes delivered ...
The major aim of Work Package 10 (WP10) Advancing the Operational Infrastructure in PRACE-2IP is ass...