Soil pressureswere measured on both sides of the cutterwheel of an EPB-shield during tunnelling in saturated sand, using foam for soil conditioning. The measured pressures are compared with the pressures at the pressure bulkhead. The pressures are not purely hydrostatic but the results are also influenced by the yield strength of the foam mixture and the effective stresses. At the lowest positions, the sensors sometimes measured effective stresses. This led to peaks in the pressures measured. It is shown that for the soil conditions present, the pressures measured at the pressure bulkhead are comparable to the pressures measured at the rotor, but the pressure gradients can differ significantly (around 30% difference in gradients is possible...
Earth pressure balance (EPB) shield tunneling in a silty sand stratum is frequently faced with the w...
Measurements have shown that the pressure distribution at the front of an EPB shield drilling in sat...
The excess pore pressure in front of a TBM is described for a slurry shield as well as an earth pres...
Soil pressureswere measured on both sides of the cutterwheel of an EPB-shield during tunnelling in s...
Soil pressureswere measured on both sides of the cutterwheel of an EPB-shield during tunnelling in s...
Earth pressure balance (EPB) tunnelling machines are commonly used for the construction of tunnels i...
Foam is often used as an additive during tunneling in soft ground conditions in an Earth Pressure Ba...
Experiments on infiltration of pressurised soil-foam mixture into saturated sand have been carried o...
Measurements have shown that the pressure distribution at the front of an EPB shield drilling in sat...
Experiments on infiltration of pressurised soil-foam mixture into saturated sand have been carried o...
Earth Pressure Balanced Shields have experienced a remarkable increase in the number of applications...
Experiments on infiltration of pressurised soil-foam mixture into saturated sand have been carried o...
Tunneling under soft ground conditions often requires active face support to prevent face instabilit...
Tunneling under soft ground conditions often requires active face support to prevent face instabilit...
ABSTRACT. Measurement of soil compaction caused by vehicle loading is difficult and often subject to...
Earth pressure balance (EPB) shield tunneling in a silty sand stratum is frequently faced with the w...
Measurements have shown that the pressure distribution at the front of an EPB shield drilling in sat...
The excess pore pressure in front of a TBM is described for a slurry shield as well as an earth pres...
Soil pressureswere measured on both sides of the cutterwheel of an EPB-shield during tunnelling in s...
Soil pressureswere measured on both sides of the cutterwheel of an EPB-shield during tunnelling in s...
Earth pressure balance (EPB) tunnelling machines are commonly used for the construction of tunnels i...
Foam is often used as an additive during tunneling in soft ground conditions in an Earth Pressure Ba...
Experiments on infiltration of pressurised soil-foam mixture into saturated sand have been carried o...
Measurements have shown that the pressure distribution at the front of an EPB shield drilling in sat...
Experiments on infiltration of pressurised soil-foam mixture into saturated sand have been carried o...
Earth Pressure Balanced Shields have experienced a remarkable increase in the number of applications...
Experiments on infiltration of pressurised soil-foam mixture into saturated sand have been carried o...
Tunneling under soft ground conditions often requires active face support to prevent face instabilit...
Tunneling under soft ground conditions often requires active face support to prevent face instabilit...
ABSTRACT. Measurement of soil compaction caused by vehicle loading is difficult and often subject to...
Earth pressure balance (EPB) shield tunneling in a silty sand stratum is frequently faced with the w...
Measurements have shown that the pressure distribution at the front of an EPB shield drilling in sat...
The excess pore pressure in front of a TBM is described for a slurry shield as well as an earth pres...