This paper proposes two cost-modification procedures designed to improve the synchronization of lot-sizing decisions among levels, in any product structure. One of these cost-modification procedures includes a random variable since ordering a given item does not imply a new order for this item's components with certainty. Simulation results confirm the superiority of the randomized cumulative Wagner-Whitin algorithm over the existing techniques included in this study.</p
Simultaneous consideration of both demand and price uncertainties has not been studied extensively i...
The classical dynamic lot size problem without backlogging is usually solved with the aid of various...
Abstract In this paper, we consider lot-sizing problems where the costs, demands and order lead time...
This paper proposes two cost-modification procedures designed to improve the synchronization of lot-...
We consider the multi-level lot-sizing (MLLS) problem as it occurs in material requirements planning...
We consider the multi-level lot-sizing (MLLS) problem as it occurs in material requirements planning...
The Capacitated Lot-Sizing Problem (CLSP) and its variants are important and challenging optimizatio...
The Capacitated Lot-Sizing Problem (CLSP) and its variants are important and challenging optimizatio...
Among the most common decisions in manufacturing and distribution companies are probably those regar...
This paper focuses on heuristic procedures for multi-stage assembly systems. Level-by-Level and Peri...
Part 1: Production ProcessInternational audienceCapacitated Lot Sizing Problem is a very important t...
In this article, we have explored multi-item capacitated lot-sizing problem by addressing the backlo...
Under single-level lot-sizing problem, well known Wagner-Whitin algorithm based on Dynamic Programmi...
The deciding factors in making lot-sizing decisions are demand pattern, setup cost and holding cost....
This paper suggests a modification of Günther's lot-sizing heuristic for capacitated single stage pr...
Simultaneous consideration of both demand and price uncertainties has not been studied extensively i...
The classical dynamic lot size problem without backlogging is usually solved with the aid of various...
Abstract In this paper, we consider lot-sizing problems where the costs, demands and order lead time...
This paper proposes two cost-modification procedures designed to improve the synchronization of lot-...
We consider the multi-level lot-sizing (MLLS) problem as it occurs in material requirements planning...
We consider the multi-level lot-sizing (MLLS) problem as it occurs in material requirements planning...
The Capacitated Lot-Sizing Problem (CLSP) and its variants are important and challenging optimizatio...
The Capacitated Lot-Sizing Problem (CLSP) and its variants are important and challenging optimizatio...
Among the most common decisions in manufacturing and distribution companies are probably those regar...
This paper focuses on heuristic procedures for multi-stage assembly systems. Level-by-Level and Peri...
Part 1: Production ProcessInternational audienceCapacitated Lot Sizing Problem is a very important t...
In this article, we have explored multi-item capacitated lot-sizing problem by addressing the backlo...
Under single-level lot-sizing problem, well known Wagner-Whitin algorithm based on Dynamic Programmi...
The deciding factors in making lot-sizing decisions are demand pattern, setup cost and holding cost....
This paper suggests a modification of Günther's lot-sizing heuristic for capacitated single stage pr...
Simultaneous consideration of both demand and price uncertainties has not been studied extensively i...
The classical dynamic lot size problem without backlogging is usually solved with the aid of various...
Abstract In this paper, we consider lot-sizing problems where the costs, demands and order lead time...