Optimized generation and delivery of electricity has become a key to efficient grid operation. Considering the thermal limits of the cables used in electricity grid, maximal yet safe loading of available cable infrastructure would become critical to optimal operation of a network. Flexible loading limits for important cable sections transporting bulk generated power from intermittent renewable sources or delivering time-varying power to load centers would maximize the utilization of available resources in terms of cable infrastructure and generation capacity. This paper presents an application to estimate and track the temperature of 3-phase cable conductors utilizing real-time high-accuracy impedance estimates. The real-time temperature es...