The nature of the mixed-use building’s characteristics should be considered to calculate a proper construction duration for mixed-use buildings in the project planning phase. However, the existing construction duration prediction models are incapable to reflect nature as they were developed mainly for single-use buildings. Therefore, the purpose of this study was to suggest a multiple linear regression model for mixed-use buildings that can help the owner and contractor predict a proper construction duration in the project planning phase. To do so, 1,969 mixed-use building project data were collected. The final prediction model for mixed-use buildings with five independent variables was suggested in this study. Its R2 was 0.637 and Ra2 was ...
Construction time performance is provoking world-wide concern and discussion within the industry. Th...
Setting the building construction duration for vertical residential works is made still in the study...
The need of respecting the construction time as one of the construction contract elements points out...
Accurate prediction of the construction duration is imperative to the reliable cash flow analysis du...
Estimates of the construction time are of key importance in the early phases of the project – they s...
The literature states that project duration is affected by various scope factors. Using 168 building...
Normal (typical) project duration is estimated at the initial stage of a renovation project and is a...
The past thirty years have seen a great surge of international attention and discussion in the domai...
Construction time has been perceived to be one of the most essential performance indicators among nu...
Construction industry is one of the most influential motivators of a national economy. The success o...
The construction industry is witnessing a rapid rise in tall building projects due to an anticipated...
The duration of construction of a project depends on many factors, such as: cost, location, site cha...
In an attempt to develop statistical construction time prediction models for high-rise private build...
Precise and accurate prediction models for duration and cost enable contractors to improve their dec...
The delay of vast building projects is still a common problem. This situation is extraordinarily sev...
Construction time performance is provoking world-wide concern and discussion within the industry. Th...
Setting the building construction duration for vertical residential works is made still in the study...
The need of respecting the construction time as one of the construction contract elements points out...
Accurate prediction of the construction duration is imperative to the reliable cash flow analysis du...
Estimates of the construction time are of key importance in the early phases of the project – they s...
The literature states that project duration is affected by various scope factors. Using 168 building...
Normal (typical) project duration is estimated at the initial stage of a renovation project and is a...
The past thirty years have seen a great surge of international attention and discussion in the domai...
Construction time has been perceived to be one of the most essential performance indicators among nu...
Construction industry is one of the most influential motivators of a national economy. The success o...
The construction industry is witnessing a rapid rise in tall building projects due to an anticipated...
The duration of construction of a project depends on many factors, such as: cost, location, site cha...
In an attempt to develop statistical construction time prediction models for high-rise private build...
Precise and accurate prediction models for duration and cost enable contractors to improve their dec...
The delay of vast building projects is still a common problem. This situation is extraordinarily sev...
Construction time performance is provoking world-wide concern and discussion within the industry. Th...
Setting the building construction duration for vertical residential works is made still in the study...
The need of respecting the construction time as one of the construction contract elements points out...