The relation between soil pore structure and water retention is complex and is often not well determined. We present a novel approach based on critical path analysis from percolation theory to refine hydraulic conductivity estimation from soil water retention curve by introducing a new tortuosity parameter as a function of scaling factor. We generalize this model to account for large shifts in the relation between soil pore structure and water retention, which are indicative of soils with multi-fractal properties, by employing a t-test on scaled saturation and suction data. The proposed model relaxes the constraints that were set on model parameters for multi-fractal soils in the literature by tuning “all” parameters against observed data u...
The dependence of the soil water content ϑ upon the matric potential ψ is studied within a fractal a...
A random fractal matrix comprising a hierarchical aggregation of primary structural elements is used...
The soil water retention curve (SWRC) is a fundamental hydraulic property majorly used to study flow...
Accurate prediction of unsaturated hydraulic conductivity is indispensable for solving problems of f...
A fundamental component of the hydrologic cycle is the movement of fluids in the pore space of geolo...
Systematic experimental deviations from theoretical predictions derived for water retention characte...
This paper presents a simple fractal model to quantify the effects of initial porosity on the soil-w...
From a theoretical point of view we study the hydraulic conductivity that appears at the generalized...
Thesis (Ph. D.)--University of Hawaii at Manoa, 1991.Includes bibliographical references (leaves 192...
In cold regions, hydraulic conductivity is a critical parameter for determining the water flow in fr...
The relationship between water content and water potential for a soil is termed its water retention ...
Accurate estimation of unsaturated hydraulic conductivity (HC) is one of the most challenging proble...
Prediction of flow through variably saturated porous media requires accurate knowledge of the soil h...
Prediction of flow through variably saturated porous media requires accurate knowledge of the soil h...
Fractal geometry was deployed to analyse water retention curves (WRC). The three models used to esti...
The dependence of the soil water content ϑ upon the matric potential ψ is studied within a fractal a...
A random fractal matrix comprising a hierarchical aggregation of primary structural elements is used...
The soil water retention curve (SWRC) is a fundamental hydraulic property majorly used to study flow...
Accurate prediction of unsaturated hydraulic conductivity is indispensable for solving problems of f...
A fundamental component of the hydrologic cycle is the movement of fluids in the pore space of geolo...
Systematic experimental deviations from theoretical predictions derived for water retention characte...
This paper presents a simple fractal model to quantify the effects of initial porosity on the soil-w...
From a theoretical point of view we study the hydraulic conductivity that appears at the generalized...
Thesis (Ph. D.)--University of Hawaii at Manoa, 1991.Includes bibliographical references (leaves 192...
In cold regions, hydraulic conductivity is a critical parameter for determining the water flow in fr...
The relationship between water content and water potential for a soil is termed its water retention ...
Accurate estimation of unsaturated hydraulic conductivity (HC) is one of the most challenging proble...
Prediction of flow through variably saturated porous media requires accurate knowledge of the soil h...
Prediction of flow through variably saturated porous media requires accurate knowledge of the soil h...
Fractal geometry was deployed to analyse water retention curves (WRC). The three models used to esti...
The dependence of the soil water content ϑ upon the matric potential ψ is studied within a fractal a...
A random fractal matrix comprising a hierarchical aggregation of primary structural elements is used...
The soil water retention curve (SWRC) is a fundamental hydraulic property majorly used to study flow...