The paper describes the performance of a 5.3-m trial embankment constructed on approximately 45 m of hydraulically placed pulverised fuel ash (pfa). It is planned to redevelop the 17-ha lagoon containing the pfa as a landfill. There is little variation in the particle size distribution of the uniformly graded silt sized pfa over the lagoon. However, the density of the pfa varies with depth with loose material underlying a denser surface layer, in a pattern that probably results from the water level in the lagoon during pfa deposition. Settlement under the trial embankment was apparently largely complete by the end of the construction period (17 days), with approximately 300 mm of settlement under the crest of the embankment. The embank...
A geotechnical study of a trial embankment on the alluvial deposits of the fenlands is presented. Th...
This paper is concerned with the interpretation of the observed and predicted performances of a full...
Understanding the age and construction quality of embankments used for road and rail infrastructure ...
The paper centres on the design and construction of a leachate lagoon at a landfill site located in ...
A widely held view is that rates of compression of peats are controlled by secondary effects and thu...
The paper describes the mechanical behaviour of double porosity clay fills. A trial embankment had b...
Cone penetration test (CPT) results on an ~20 year old, hydraulically placed pulverised fuel ash (PF...
Two trial embankments namely the North and South trial embankments were constructed in the state of ...
A low test embankment have been constructed on a soft and fibrous peat deposits. The thickness of th...
This paper illustrates a case history, based on full-scale tests (trial embankment). More specifical...
Continuous determinations of density, moisture content, and permeability through a 140-foot high coa...
Excess pore pressures and consolidation settlements observed during the construction of a trial emba...
Many industrial processes result in the production of silt sized waste materials which may be dispos...
A high embankment was built on a soft clay disturbed due to an inadequate technique. Settlement anal...
The paper deals with the settlement analysis of an embankment founded on soft soil and realized for ...
A geotechnical study of a trial embankment on the alluvial deposits of the fenlands is presented. Th...
This paper is concerned with the interpretation of the observed and predicted performances of a full...
Understanding the age and construction quality of embankments used for road and rail infrastructure ...
The paper centres on the design and construction of a leachate lagoon at a landfill site located in ...
A widely held view is that rates of compression of peats are controlled by secondary effects and thu...
The paper describes the mechanical behaviour of double porosity clay fills. A trial embankment had b...
Cone penetration test (CPT) results on an ~20 year old, hydraulically placed pulverised fuel ash (PF...
Two trial embankments namely the North and South trial embankments were constructed in the state of ...
A low test embankment have been constructed on a soft and fibrous peat deposits. The thickness of th...
This paper illustrates a case history, based on full-scale tests (trial embankment). More specifical...
Continuous determinations of density, moisture content, and permeability through a 140-foot high coa...
Excess pore pressures and consolidation settlements observed during the construction of a trial emba...
Many industrial processes result in the production of silt sized waste materials which may be dispos...
A high embankment was built on a soft clay disturbed due to an inadequate technique. Settlement anal...
The paper deals with the settlement analysis of an embankment founded on soft soil and realized for ...
A geotechnical study of a trial embankment on the alluvial deposits of the fenlands is presented. Th...
This paper is concerned with the interpretation of the observed and predicted performances of a full...
Understanding the age and construction quality of embankments used for road and rail infrastructure ...