This study evaluates the decision-making process of the U.S. Army Corps of Engineers (COE) as it applies to the selection of land or open-water disposal sites for sediment from dredging projects planned by the COE. The study seeks to illustrate: 1) the structure of the COE decision-making process as provided for in laws, regulations, and COE policies; 2) the operational, economic, and environmental variables that might influence COE decision-making; 3) how the New England Division of the COE makes decisions on disposal sites for dredged material through consideration of operational, economic and environmental objectives. The study finds that the COE decision-making process, with respect to dredged material disposal, is structurally comple...
part of Task 2C (Containment Area Operations) of the Corps of Engineers Dredged Material Research Pr...
The objective of the Westchester Creek project was to evaluate proposed dredged material from this a...
The objective of the Eastchester project (Federal Project [FP] No. 6) was to evaluate proposed dredg...
This paper summarizes investigations conducted under the Dredged Material Research Program, Long-Ter...
Engineers as the agency to issue permits for the discharge of dredged or fill material into navigabl...
97851956211062PDFResearch PaperDredgingDredged materialsEnvironmental impactsPublic opinionProcedure...
In an attempt of the US Army Corps of Engineers’ (USACE) continuous clearing waterways for improved ...
This project investigates the utility of Multicriteria Decision Analysis (MCDA) as a tool for testin...
This report presents the results of a detailed evaluation of the dredged material ocean disposal pro...
PURPOSE: Decision making for complex environmental problems such as dredged material management can ...
Material Research Program (DMRP). The objective of Task 5D, part of the Productive Uses Project, was...
Thesis (S.M.)--Massachusetts Institute of Technology, Dept. of Civil and Environmental Engineering; ...
"Conducted by U. S. Army Engineer Waterways Experiment Station, Office of Dredged Material Research,...
(Corps) to provide guidance for applicants proposing open-water disposal of dredged material in New ...
Since the closures, in 1971, of the Prudence Island and Brenton Reef disposal sites, water-related i...
part of Task 2C (Containment Area Operations) of the Corps of Engineers Dredged Material Research Pr...
The objective of the Westchester Creek project was to evaluate proposed dredged material from this a...
The objective of the Eastchester project (Federal Project [FP] No. 6) was to evaluate proposed dredg...
This paper summarizes investigations conducted under the Dredged Material Research Program, Long-Ter...
Engineers as the agency to issue permits for the discharge of dredged or fill material into navigabl...
97851956211062PDFResearch PaperDredgingDredged materialsEnvironmental impactsPublic opinionProcedure...
In an attempt of the US Army Corps of Engineers’ (USACE) continuous clearing waterways for improved ...
This project investigates the utility of Multicriteria Decision Analysis (MCDA) as a tool for testin...
This report presents the results of a detailed evaluation of the dredged material ocean disposal pro...
PURPOSE: Decision making for complex environmental problems such as dredged material management can ...
Material Research Program (DMRP). The objective of Task 5D, part of the Productive Uses Project, was...
Thesis (S.M.)--Massachusetts Institute of Technology, Dept. of Civil and Environmental Engineering; ...
"Conducted by U. S. Army Engineer Waterways Experiment Station, Office of Dredged Material Research,...
(Corps) to provide guidance for applicants proposing open-water disposal of dredged material in New ...
Since the closures, in 1971, of the Prudence Island and Brenton Reef disposal sites, water-related i...
part of Task 2C (Containment Area Operations) of the Corps of Engineers Dredged Material Research Pr...
The objective of the Westchester Creek project was to evaluate proposed dredged material from this a...
The objective of the Eastchester project (Federal Project [FP] No. 6) was to evaluate proposed dredg...