Workspace demand changes across space and time, stressing the need to consider space as a limited and renewable resource. Traditional scheduling techniques have not fully handled this issue. This paper proposes a workspace management framework using a game engine to address that. The simulator detects spatial interferences by combining geometric computations and physics simulations. The detected conflicts are filtered through Bayesian inference to detect non-critical scenarios and avoid overestimation. The proposed spatial conflict simulator was tested using a real use case and compared to commercial tools. Results showed that the Navisworks approach detected 58 spatial conflicts (of which only 25% were relevant), the Synchro approach detec...
This paper presents research that led to the design and implementation of efficient interference det...
When multiple workspaces for resources are allocated within a narrow work area, the constructability...
In order to improve the flexibility and adaptability of an automated model to various different proj...
Workspace demand changes across space and time, stressing the need to consider space as a limited an...
In construction projects, the space required for executing each activity is unanimously recognized a...
In the field of construction works planning, workspaces must be considered as limited resources, in ...
Spatial conflicts affect crews’ productivity and workers’ safety. The idea of considering workspaces...
Workspace conflicts and building components can happen in different forms and both permanently and t...
This work addresses the problem arising on all construction sites: the occurrence of workspace inter...
In construction management, a spatial conflict between two activities is generally identified as the...
Extensive research efforts have been made in construction simulation. Nevertheless, work space is ne...
Nei cantieri edili, quali contesti altamente dinamici, lo spazio richiesto dalle attività muta conti...
Workspaces on construction sites represent a key resource due to their limited availability and impa...
With increasing pressure for shorter delivery schedules, space is a critical resource at constructio...
The recently emerged field of game analytics and thedevelopment and adaptation of business intellige...
This paper presents research that led to the design and implementation of efficient interference det...
When multiple workspaces for resources are allocated within a narrow work area, the constructability...
In order to improve the flexibility and adaptability of an automated model to various different proj...
Workspace demand changes across space and time, stressing the need to consider space as a limited an...
In construction projects, the space required for executing each activity is unanimously recognized a...
In the field of construction works planning, workspaces must be considered as limited resources, in ...
Spatial conflicts affect crews’ productivity and workers’ safety. The idea of considering workspaces...
Workspace conflicts and building components can happen in different forms and both permanently and t...
This work addresses the problem arising on all construction sites: the occurrence of workspace inter...
In construction management, a spatial conflict between two activities is generally identified as the...
Extensive research efforts have been made in construction simulation. Nevertheless, work space is ne...
Nei cantieri edili, quali contesti altamente dinamici, lo spazio richiesto dalle attività muta conti...
Workspaces on construction sites represent a key resource due to their limited availability and impa...
With increasing pressure for shorter delivery schedules, space is a critical resource at constructio...
The recently emerged field of game analytics and thedevelopment and adaptation of business intellige...
This paper presents research that led to the design and implementation of efficient interference det...
When multiple workspaces for resources are allocated within a narrow work area, the constructability...
In order to improve the flexibility and adaptability of an automated model to various different proj...