A dynamic programming formulation is presented for determining an optimal solution to a problem where n jobs are to be sequenced in a multi-stage production environment. An application of a developed formulation to a plastic pipe manufacturing factory is also presented. Conditions are such that the job sequence is the same in all stages, each job requires setups at each stage and setup times are sequence dependent. An optimal solution is such that the minimum total tardiness is achieved. A listing of the developed computer program is also provided
© 2016, Springer Science+Business Media New York. This paper studies the problem of scheduling three...
This paper deals with a sequencing problem arising in the management of paced flowlines, that is pro...
© 2016 Operational Research Society Ltd. This paper investigates the scheduling problem in a two-sta...
Abstract. The purpose of this study is to develop an effective scheduling methodology for a realisti...
AbstractGiven a set of n jobs each of which is assigned a due-date and all jobs are simultaneously a...
Minimising makespan aims to achieve high utilisation of equipment and resources by getting all jobs ...
This paper focuses on multistage, multiproduct dynamic production systems. Up to now little work has...
The paper deals with a two-stage hybrid flowshop problem with one machine in the first stage and two...
In a general flow-shop situation, where all the jobs must pass through all the machines in the same ...
AbstractThis paper addresses scheduling n jobs in a two-machine flow shop to minimize the total comp...
AbstractThis paper presents an MILP model for the permutation flowshop wherein the setup times are b...
This paper addresses scheduling n jobs in a two-machine flow shop to minimize the total completion t...
In the present work a literature overview was given on solution techniques considering basic as well...
In this paper, we deal with the problem of optimally assigning and sequencing the operations of a se...
job processing time, flow shop scheduling problem Dr. P. V. Ubale Associate professor in Statistics,...
© 2016, Springer Science+Business Media New York. This paper studies the problem of scheduling three...
This paper deals with a sequencing problem arising in the management of paced flowlines, that is pro...
© 2016 Operational Research Society Ltd. This paper investigates the scheduling problem in a two-sta...
Abstract. The purpose of this study is to develop an effective scheduling methodology for a realisti...
AbstractGiven a set of n jobs each of which is assigned a due-date and all jobs are simultaneously a...
Minimising makespan aims to achieve high utilisation of equipment and resources by getting all jobs ...
This paper focuses on multistage, multiproduct dynamic production systems. Up to now little work has...
The paper deals with a two-stage hybrid flowshop problem with one machine in the first stage and two...
In a general flow-shop situation, where all the jobs must pass through all the machines in the same ...
AbstractThis paper addresses scheduling n jobs in a two-machine flow shop to minimize the total comp...
AbstractThis paper presents an MILP model for the permutation flowshop wherein the setup times are b...
This paper addresses scheduling n jobs in a two-machine flow shop to minimize the total completion t...
In the present work a literature overview was given on solution techniques considering basic as well...
In this paper, we deal with the problem of optimally assigning and sequencing the operations of a se...
job processing time, flow shop scheduling problem Dr. P. V. Ubale Associate professor in Statistics,...
© 2016, Springer Science+Business Media New York. This paper studies the problem of scheduling three...
This paper deals with a sequencing problem arising in the management of paced flowlines, that is pro...
© 2016 Operational Research Society Ltd. This paper investigates the scheduling problem in a two-sta...