In the past decades, resource parameters have been introduced in project scheduling literature to measure the scarceness of resources of a project instance. In this paper, we incorporate these resource scarceness parameters in the search process to solve the multi-mode resource constrained project scheduling problem, in which multiple execution modes are available for each activity in the project. Therefore, we propose a scatter search algorithm, which is executed with different improvement methods, each tailored to the specific characteristics of different renewable and nonrenewable resource scarceness values. Computational results prove the effectiveness of the improvement methods and reveal that the procedure is among the best performing...
This paper reports on a new solution approach for the well-known multi-mode resource-constrained pro...
In this study, the authors consider a project scheduling problem with a single non-renewable resourc...
In this study, the authors consider a project scheduling problem with a single non-renewable resourc...
In the past decades, resource parameters have been introduced in project scheduling literature to me...
This paper considers a project scheduling problem with the objective of minimizing resource availabi...
A multi-skilled project scheduling problem (MSPSP) has generally been presented to schedule informat...
In this paper, we present a meta-heuristic algorithm for the well-known resource-constrained project...
We develop a heuristic procedure for solving the discrete time/resource trade-off problem in the fie...
A multi-skilled project scheduling problem (MSPSP) has generally been presented to schedule informat...
We address a project scheduling problem with resource availability cost for which the activity durat...
In this paper, the beam search technique is applied to resource constrained project scheduling where...
This chapter reports on a new solution approach for the multi-mode resource-constrained project sche...
Abstract. In this paper, a new hybrid metaheuristic algorithm based on the scatter search approach i...
This paper proposes an improved SLA^* (search and learning A^* algorithm) for solving resource-const...
International audienceThe scheduling problem under study may be viewed as an extension of the standa...
This paper reports on a new solution approach for the well-known multi-mode resource-constrained pro...
In this study, the authors consider a project scheduling problem with a single non-renewable resourc...
In this study, the authors consider a project scheduling problem with a single non-renewable resourc...
In the past decades, resource parameters have been introduced in project scheduling literature to me...
This paper considers a project scheduling problem with the objective of minimizing resource availabi...
A multi-skilled project scheduling problem (MSPSP) has generally been presented to schedule informat...
In this paper, we present a meta-heuristic algorithm for the well-known resource-constrained project...
We develop a heuristic procedure for solving the discrete time/resource trade-off problem in the fie...
A multi-skilled project scheduling problem (MSPSP) has generally been presented to schedule informat...
We address a project scheduling problem with resource availability cost for which the activity durat...
In this paper, the beam search technique is applied to resource constrained project scheduling where...
This chapter reports on a new solution approach for the multi-mode resource-constrained project sche...
Abstract. In this paper, a new hybrid metaheuristic algorithm based on the scatter search approach i...
This paper proposes an improved SLA^* (search and learning A^* algorithm) for solving resource-const...
International audienceThe scheduling problem under study may be viewed as an extension of the standa...
This paper reports on a new solution approach for the well-known multi-mode resource-constrained pro...
In this study, the authors consider a project scheduling problem with a single non-renewable resourc...
In this study, the authors consider a project scheduling problem with a single non-renewable resourc...