Results are presented from the testing to failure of a 55-year-old prestressed concrete bridge with five continuous spans and a total length of 121.5 m. The bridge was situated in Kiruna in northern Sweden. Results are given from load, deflection and strain measurements during bending-shear tests of the girders and from a punching test of the slab. The testing was carried out in June 2014. Extensive assessment and modelling of the bridge with finite element methods have taken place and is summarized. The strength of the bridge was much higher than what could be found with ordinary code methods. The advanced non-linear models were, after calibration, able to predict the behaviour in a good way. In numerical assessments of concrete bridges, t...
To calibrate methods for condition assessment of prestressed concrete (PC) bridges, tests were carri...
The demolition of an old structure and replacement with a new one is a very complex, time consuming ...
The demolition of an old structure and replacement with a new one is a very complex, time consuming ...
Results are presented from the testing to failure of a 55-year-old prestressed concrete bridge with ...
Results are presented from the testing to failure of a 55-year-old prestressed concrete bridge with ...
Results are presented from the testing to failure of a 55-year-old prestressed concrete bridge with ...
Results are presented from the testing to failure of a 55-year-old prestressed concrete bridge with ...
To calibrate methods for condition assessment of prestressed concrete (PC) bridges, tests are planne...
To calibrate methods for condition assessment of prestressed concrete (PC) bridges, tests are planne...
To calibrate methods for condition assessment of prestressed concrete (PC) bridges, tests areplanned...
Three Swedish concrete bridges have been tested to failure and the results have been compared to ass...
Three Swedish concrete bridges have been tested to failure and the results have been compared to ass...
Three Swedish concrete bridges have been tested to failure and the results have been compared to ass...
To calibrate methods for condition assessment of prestressed concrete (PC) bridges, tests were carri...
To calibrate methods for condition assessment of prestressed concrete (PC) bridges, tests were carri...
To calibrate methods for condition assessment of prestressed concrete (PC) bridges, tests were carri...
The demolition of an old structure and replacement with a new one is a very complex, time consuming ...
The demolition of an old structure and replacement with a new one is a very complex, time consuming ...
Results are presented from the testing to failure of a 55-year-old prestressed concrete bridge with ...
Results are presented from the testing to failure of a 55-year-old prestressed concrete bridge with ...
Results are presented from the testing to failure of a 55-year-old prestressed concrete bridge with ...
Results are presented from the testing to failure of a 55-year-old prestressed concrete bridge with ...
To calibrate methods for condition assessment of prestressed concrete (PC) bridges, tests are planne...
To calibrate methods for condition assessment of prestressed concrete (PC) bridges, tests are planne...
To calibrate methods for condition assessment of prestressed concrete (PC) bridges, tests areplanned...
Three Swedish concrete bridges have been tested to failure and the results have been compared to ass...
Three Swedish concrete bridges have been tested to failure and the results have been compared to ass...
Three Swedish concrete bridges have been tested to failure and the results have been compared to ass...
To calibrate methods for condition assessment of prestressed concrete (PC) bridges, tests were carri...
To calibrate methods for condition assessment of prestressed concrete (PC) bridges, tests were carri...
To calibrate methods for condition assessment of prestressed concrete (PC) bridges, tests were carri...
The demolition of an old structure and replacement with a new one is a very complex, time consuming ...
The demolition of an old structure and replacement with a new one is a very complex, time consuming ...