This Annex provides detailed information on work carried out on runtime systems during the first 18 months of the TENCompetence projectThe work on this publication has been sponsored by the TENCompetence Integrated Project that is funded by the European Commission's 6th Framework Programme, priority IST/Technology Enhanced Learning. Contract 027087 [http://www.tencompetence.org
Alberts, J., Heyenrath, S., Lemmers, R., & Cherian, R. (2009). ID3.27 Guidelines describing installa...
The thermal aging of emission control devices is the most important cause of vehicles' emissions det...
This document reports on the implementation and evaluation plan of the five TENCompetence pilots tha...
Alberts, J., Heyenrath, S., & Cherian, R. (2009). ID3.21-Guidelines describing installation, configu...
This internal deliverable contains the Gap Analysis of the Initial Requirements of TENCompetence pro...
This deliverable reports on work carried out in TENCompetence work package 10, Dissemination and Val...
The document explains how the PCM server works and how to use version 1.0 of the PCM services to thr...
This internal deliverable contains two main parts: 1. Functional Requirements for the TENCompetence...
Greller, W., Kew, C., Kravcik, M., Krekels, B., & Manderveld, J. (2009). D9.3-TENCompetence Trainin...
Mazzetti, A., Dicerto, M., Portelli, G., Grigorov, A., Georgiev, A., Zerr, S., Kawase, R., De Coi, J...
Summary of the results of TENCompetence WP7 during the first 18 months. Progress towards a learning ...
Herder, E., Kärger, P., Berlanga, A., Drachsler, H., Janssen, J., Kalz, M., & Heyenrath, S. (2009). ...
This report provides the state of the art review and the design towards the definition of the TenC C...
Mazzetti, A., Dicerto, M., Portelli, G., Grigorov, A., Georgiev, A., Yordanova, K., Zerr, S., Kawase...
Summary of the results of TENCompetence WP7 during the first 18 months. Progress towards a learning ...
Alberts, J., Heyenrath, S., Lemmers, R., & Cherian, R. (2009). ID3.27 Guidelines describing installa...
The thermal aging of emission control devices is the most important cause of vehicles' emissions det...
This document reports on the implementation and evaluation plan of the five TENCompetence pilots tha...
Alberts, J., Heyenrath, S., & Cherian, R. (2009). ID3.21-Guidelines describing installation, configu...
This internal deliverable contains the Gap Analysis of the Initial Requirements of TENCompetence pro...
This deliverable reports on work carried out in TENCompetence work package 10, Dissemination and Val...
The document explains how the PCM server works and how to use version 1.0 of the PCM services to thr...
This internal deliverable contains two main parts: 1. Functional Requirements for the TENCompetence...
Greller, W., Kew, C., Kravcik, M., Krekels, B., & Manderveld, J. (2009). D9.3-TENCompetence Trainin...
Mazzetti, A., Dicerto, M., Portelli, G., Grigorov, A., Georgiev, A., Zerr, S., Kawase, R., De Coi, J...
Summary of the results of TENCompetence WP7 during the first 18 months. Progress towards a learning ...
Herder, E., Kärger, P., Berlanga, A., Drachsler, H., Janssen, J., Kalz, M., & Heyenrath, S. (2009). ...
This report provides the state of the art review and the design towards the definition of the TenC C...
Mazzetti, A., Dicerto, M., Portelli, G., Grigorov, A., Georgiev, A., Yordanova, K., Zerr, S., Kawase...
Summary of the results of TENCompetence WP7 during the first 18 months. Progress towards a learning ...
Alberts, J., Heyenrath, S., Lemmers, R., & Cherian, R. (2009). ID3.27 Guidelines describing installa...
The thermal aging of emission control devices is the most important cause of vehicles' emissions det...
This document reports on the implementation and evaluation plan of the five TENCompetence pilots tha...