Cost and schedule overruns are a major issue in the construction industry and a variety of location and activity-based planning, and control methods are used to address these issues. Takt time planning (TTP) has recently gained increased attention in Scandinavia through its use of fixed durations, use of location as a resource and demand on trade-completion and control before moving to the next location. The desire is to create a stable pace of work for each trade through a sequence of locations. There are also challenges to accomplish and communicate takt time schedules. However, through a 4D based collaborative planning approach, communication of the plan and a better understanding of the project and its challenges in production is reache...
Although time is a critical factor for most projects, the majority of construction projects encounte...
Construction projects are becoming increasingly complex with a higher degree of specialization, resu...
Modern construction planning philosophies, such as The Last Planner System (LPS), stipulate that tho...
Cost and schedule overruns are a major issue in the construction industry and a variety of location ...
Construction projects have for a long time been characterized by increased specialization, low produ...
This paper presents findings of a study about how to extend the use of Takt-time planning in constru...
Work structuring is critical to project production system design because it helps to define who is d...
Work structuring is critical to project production system design because it helps to define who is d...
Takt time and LBMS are getting increased attention from practitioners of Lean Construction. The takt...
Takt time planning has recently received a lot of attention in lean construction community. However,...
Construction of high-rise constructions has during past decades seen an incremental increase, which ...
Now a day’s there is dramatic change from traditional to digital information processing in construct...
With the rising complexity of construction projects, the need to manage this complexity rises. The c...
Commonly, there are no compactible and integrated models among architecture, structure and mechanica...
[EN] Construction planning is essential for the project success. It is a fundamental and challenging...
Although time is a critical factor for most projects, the majority of construction projects encounte...
Construction projects are becoming increasingly complex with a higher degree of specialization, resu...
Modern construction planning philosophies, such as The Last Planner System (LPS), stipulate that tho...
Cost and schedule overruns are a major issue in the construction industry and a variety of location ...
Construction projects have for a long time been characterized by increased specialization, low produ...
This paper presents findings of a study about how to extend the use of Takt-time planning in constru...
Work structuring is critical to project production system design because it helps to define who is d...
Work structuring is critical to project production system design because it helps to define who is d...
Takt time and LBMS are getting increased attention from practitioners of Lean Construction. The takt...
Takt time planning has recently received a lot of attention in lean construction community. However,...
Construction of high-rise constructions has during past decades seen an incremental increase, which ...
Now a day’s there is dramatic change from traditional to digital information processing in construct...
With the rising complexity of construction projects, the need to manage this complexity rises. The c...
Commonly, there are no compactible and integrated models among architecture, structure and mechanica...
[EN] Construction planning is essential for the project success. It is a fundamental and challenging...
Although time is a critical factor for most projects, the majority of construction projects encounte...
Construction projects are becoming increasingly complex with a higher degree of specialization, resu...
Modern construction planning philosophies, such as The Last Planner System (LPS), stipulate that tho...