The water environment treatment public-private partnership (PPP) project has a long cooperation period, large investment scale, high technical requirements, and more complex risks, which are very important to identifying and preventing risks. This paper establishes a risk evaluation model for water environmental treatment PPP projects based on the intuitionistic fuzzy Multi-Objective Optimization on the basis of a Ratio Analysis plus the full Multiplicative form (MULTIMOORA) improved Failure Mode and Effects Analysis (FMEA) method. Firstly, the risk indicators system of the water environmental treatment PPP project was constructed through the literature frequency statistics method and semi-structured interviews. Subsequently, the intuitioni...
The main characteristic of the water resources system (WRS) is its great complexity and uncertainty,...
A fuzzy parameterized probabilistic analysis (FPPA) method was developed in this study to assess ris...
Recently, risk assessment has become one of the most challenging issues in the areas of construction...
As governments embark on public-private partnerships (PPPs) to develop their water infrastructure, e...
Evaluating the sustainability risk level of public–private partnership (PPP) projects can reduce pro...
The South-to-North Water Diversion Project consists of long-distance water delivery channels and a c...
Earlier research works on PPP showed that an objective, reliable, and practical risk assessment mode...
Earlier research works on PPP showed that an objective, reliable, and practical risk assessment mode...
The build–own–operate–transfer (BOOT) scheme is widely used for the provision of new bulk water supp...
The allocation of risk between public-sector and private-sector parties in a public-private partners...
In this paper, a fuzzy rating tool was developed for river-type hydropower plant projects, and risk ...
Appropriate risk allocation (RA) between public and private sectors according to their risk manageme...
The water conservancy scenic spot is an important part of China’s water ecological civilization cons...
In order to make up for the shortage of public-private partnership (PPP) model, more and more sewage...
The public-private partnership (PPP) has been adopted globally to meet intensifying demands for publ...
The main characteristic of the water resources system (WRS) is its great complexity and uncertainty,...
A fuzzy parameterized probabilistic analysis (FPPA) method was developed in this study to assess ris...
Recently, risk assessment has become one of the most challenging issues in the areas of construction...
As governments embark on public-private partnerships (PPPs) to develop their water infrastructure, e...
Evaluating the sustainability risk level of public–private partnership (PPP) projects can reduce pro...
The South-to-North Water Diversion Project consists of long-distance water delivery channels and a c...
Earlier research works on PPP showed that an objective, reliable, and practical risk assessment mode...
Earlier research works on PPP showed that an objective, reliable, and practical risk assessment mode...
The build–own–operate–transfer (BOOT) scheme is widely used for the provision of new bulk water supp...
The allocation of risk between public-sector and private-sector parties in a public-private partners...
In this paper, a fuzzy rating tool was developed for river-type hydropower plant projects, and risk ...
Appropriate risk allocation (RA) between public and private sectors according to their risk manageme...
The water conservancy scenic spot is an important part of China’s water ecological civilization cons...
In order to make up for the shortage of public-private partnership (PPP) model, more and more sewage...
The public-private partnership (PPP) has been adopted globally to meet intensifying demands for publ...
The main characteristic of the water resources system (WRS) is its great complexity and uncertainty,...
A fuzzy parameterized probabilistic analysis (FPPA) method was developed in this study to assess ris...
Recently, risk assessment has become one of the most challenging issues in the areas of construction...