In order to determine the reasonable width of a stopping coal pillar in close-distance coal seams, the evolution law of front abutment pressure of the working face with repeated mining was studied. Based on the actual engineering project, we conducted field measurement, theoretical analyses, numerical simulations and a physical similarity simulation test to study. The results show that: (1) according to field measurement, the influence range of front abutment pressure increases from 60 m to 75 m with repeated mining; (2) according to theoretical analysis, the arch height and span are negatively and positively correlated with the influence range of front abutment pressure, respectively; (3) with repeated mining, the arch height increased to ...
Multi-coal-seam mining creates surrounding rock control difficulties, because the mining of a coal f...
In this study, taking the Sheng’an coal mine as an engineering background, the failure characteristi...
The condition of the coal pillars remained in the room-and-pillar gobs is complicated. The stresses ...
In order to explore the stability of coal pillar and the characteristics of roof movement during the...
Abutment pressure distribution is different when a longwall panel is passing through the abandoned g...
It is of great significance to study the reasonable position of mining roadway under strip coal pill...
Coal wall spalling is regarded as a key technical problem influencing safe and efficient mining of l...
On the working face below shallow and close coal seams, there are residual pillars. The mine’s abili...
On the working face below shallow and close coal seams, there are residual pillars. The mine’s abili...
To study the ground pressure features of roadway under close range goaf,deformation laws of surround...
The occurrence of severe mine pressure in stope is of high risk, and the mining depth is the main co...
Concerning the issue of mine pressure behaviors occurred in fully mechanized caving mining of thick ...
An appropriate layout of the first-mining working face of protected seams is key to rockburst preven...
This paper presents a collaborative control scheme involving “unloading-solidifying” to prevent rock...
A case study based on the 401103 fully mechanized caving face in the Hujiahe Coal Mine was carried o...
Multi-coal-seam mining creates surrounding rock control difficulties, because the mining of a coal f...
In this study, taking the Sheng’an coal mine as an engineering background, the failure characteristi...
The condition of the coal pillars remained in the room-and-pillar gobs is complicated. The stresses ...
In order to explore the stability of coal pillar and the characteristics of roof movement during the...
Abutment pressure distribution is different when a longwall panel is passing through the abandoned g...
It is of great significance to study the reasonable position of mining roadway under strip coal pill...
Coal wall spalling is regarded as a key technical problem influencing safe and efficient mining of l...
On the working face below shallow and close coal seams, there are residual pillars. The mine’s abili...
On the working face below shallow and close coal seams, there are residual pillars. The mine’s abili...
To study the ground pressure features of roadway under close range goaf,deformation laws of surround...
The occurrence of severe mine pressure in stope is of high risk, and the mining depth is the main co...
Concerning the issue of mine pressure behaviors occurred in fully mechanized caving mining of thick ...
An appropriate layout of the first-mining working face of protected seams is key to rockburst preven...
This paper presents a collaborative control scheme involving “unloading-solidifying” to prevent rock...
A case study based on the 401103 fully mechanized caving face in the Hujiahe Coal Mine was carried o...
Multi-coal-seam mining creates surrounding rock control difficulties, because the mining of a coal f...
In this study, taking the Sheng’an coal mine as an engineering background, the failure characteristi...
The condition of the coal pillars remained in the room-and-pillar gobs is complicated. The stresses ...