Ultra-fine cemented paste backfill (UCPB) is prepared using tailings, binder and water. The factors affecting the resistance of UCPB pipe transport are numerous and complex, and the factor interactions restrict the rational development of the filling pipe transport design, which is not conducive to reducing the resistance. This paper categorizes and integrates the factors of pipe transport resistance by theoretical analysis and uses response surface methodology (RSM) to study the influence of different types of factors on the UCPB pipe transport resistance. The results show that the pipe transport resistance factors are classified into endogenous and exogenous factors. According to the classification, the reduction rate of the optimized pip...
Due to high-mud content in superfine unclassified tailings (SUT), the viscosity of cemented paste ba...
In this study, we developed a pipeline transport model to investigate the influence of particle sedi...
Filling mining method can dispose of the tailings into filling slurry, which can be transported to t...
Cemented paste backfill (CPB), a technology placing the solid waste into mined-out stopes in the min...
The rheological behaviour of cemented paste backfill (CPB) has an important influence on the stabili...
In order to investigate the high volume fraction problem of the solid phase in superfine unclassifie...
Recycling of tailings in the form of cemented paste backfill (CPB) is a widely adopted practice in t...
In order to investigate the high volume fraction problem of the solid phase in superfine unclassifie...
Industrial size pipe loop tests were conducted to determine the effect of paste mass concentration, ...
Industrial size pipe loop tests were conducted to determine the effect of paste mass concentration, ...
As lots of underground mines have been exploited in the past decades, many stope instability and sur...
As lots of underground mines have been exploited in the past decades, many stope instability and sur...
Cemented coal gangue-fly ash backfill (CGFB) slurry has commonly been used to control subsidence dam...
Clogging pipelines is one of the most common and urgent problems in paste backfill mining. The aim o...
In this study, we developed a pipeline transport model to investigate the influence of particle sedi...
Due to high-mud content in superfine unclassified tailings (SUT), the viscosity of cemented paste ba...
In this study, we developed a pipeline transport model to investigate the influence of particle sedi...
Filling mining method can dispose of the tailings into filling slurry, which can be transported to t...
Cemented paste backfill (CPB), a technology placing the solid waste into mined-out stopes in the min...
The rheological behaviour of cemented paste backfill (CPB) has an important influence on the stabili...
In order to investigate the high volume fraction problem of the solid phase in superfine unclassifie...
Recycling of tailings in the form of cemented paste backfill (CPB) is a widely adopted practice in t...
In order to investigate the high volume fraction problem of the solid phase in superfine unclassifie...
Industrial size pipe loop tests were conducted to determine the effect of paste mass concentration, ...
Industrial size pipe loop tests were conducted to determine the effect of paste mass concentration, ...
As lots of underground mines have been exploited in the past decades, many stope instability and sur...
As lots of underground mines have been exploited in the past decades, many stope instability and sur...
Cemented coal gangue-fly ash backfill (CGFB) slurry has commonly been used to control subsidence dam...
Clogging pipelines is one of the most common and urgent problems in paste backfill mining. The aim o...
In this study, we developed a pipeline transport model to investigate the influence of particle sedi...
Due to high-mud content in superfine unclassified tailings (SUT), the viscosity of cemented paste ba...
In this study, we developed a pipeline transport model to investigate the influence of particle sedi...
Filling mining method can dispose of the tailings into filling slurry, which can be transported to t...