The usage of mechanical vibrations produced by the hydropower plant (HPP) turbine may be used for seismic sounding of large-scale constructions as the earth-fill dam and its abutment contacts. Such vibrations are monochromatic oscillations at main frequencies and their harmonics produced by turbine. Seismic sensors installed on the dam's crest and inside it, if it possible, and in the area of abutment contacts register microseisms include HPP turbine operation vibrations which may be extracted by seismic data processing, i.e., filtering. We discuss two data processing possibilities: symphonious filter as the hardware one and power spectrum calculation as digital one. We consider the two case of earth-fill dams state investigations. There ar...
This paper focuses on the seismic stability analysis of a hydraulic fill dam built in the mid-1920’s...
This short paper describes a problematic of a small hydroelectric power station machinery vibration ...
An experimental multi-parameter structural monitoring system has been installed on the Kurpsai dam, ...
The usage of mechanical vibrations produced by the hydropower plant (HPP) turbine may be used for se...
In this article, we suggest a new type of seismic source for surveying both structure state and foun...
The capabilities of the complex of seismic methods, which are suitable for inspecting of large strat...
Seismic instrumentation of dams and reservoirs sites is accepted today as a valuable tool to underst...
The reservoir was built in the middle of the 20th century with a total capacity of 750,000 m3. The h...
This paper outlines the seismic instrumentation being adopted for river valley projects in India, Mo...
The use of geophysical methods in dam sites investigations and safety monitory has proved their good...
This paper proposes hydro generator vibration observations under various conditions and solution of ...
Blasting test studies have one drawback with regard to earthquake studies; they are concerned with v...
The fast change in new renewable energy is affecting directly the required operating range of hydrop...
This report presents data on earthquake recordings made on or near dams. The serious consequences of...
Currently, the Republic of Uzbekistan is undergoing rapid development in the sphere of the hydropowe...
This paper focuses on the seismic stability analysis of a hydraulic fill dam built in the mid-1920’s...
This short paper describes a problematic of a small hydroelectric power station machinery vibration ...
An experimental multi-parameter structural monitoring system has been installed on the Kurpsai dam, ...
The usage of mechanical vibrations produced by the hydropower plant (HPP) turbine may be used for se...
In this article, we suggest a new type of seismic source for surveying both structure state and foun...
The capabilities of the complex of seismic methods, which are suitable for inspecting of large strat...
Seismic instrumentation of dams and reservoirs sites is accepted today as a valuable tool to underst...
The reservoir was built in the middle of the 20th century with a total capacity of 750,000 m3. The h...
This paper outlines the seismic instrumentation being adopted for river valley projects in India, Mo...
The use of geophysical methods in dam sites investigations and safety monitory has proved their good...
This paper proposes hydro generator vibration observations under various conditions and solution of ...
Blasting test studies have one drawback with regard to earthquake studies; they are concerned with v...
The fast change in new renewable energy is affecting directly the required operating range of hydrop...
This report presents data on earthquake recordings made on or near dams. The serious consequences of...
Currently, the Republic of Uzbekistan is undergoing rapid development in the sphere of the hydropowe...
This paper focuses on the seismic stability analysis of a hydraulic fill dam built in the mid-1920’s...
This short paper describes a problematic of a small hydroelectric power station machinery vibration ...
An experimental multi-parameter structural monitoring system has been installed on the Kurpsai dam, ...