Flood frequency analysis is accepted as one of the most important applications of water resource engineering. Measurements with higher and lower values, such as outliers, can be seen in hydrological data sets based on longer observation periods that extend the overall range. This study used 50 and 25 years of annual maximum flow data from 1962 to 2011 and from 1987 to 2011 from the Stream Gauging Stations (SGS) numbered 1712, 1717, and 1721 located within the borders of the Eastern Mediterranean Basin. The flood discharges were estimated using Normal, Gumbel, and Pearson Type III probability distributions. The study adopted Kolmogorov–Smirnov (K-S) and Chi-squared goodness-of-fit tests to investigate the suitability of probability distribut...
The two-parameter log-normal, three-parameter log-normal, smemax, two-step-power, log-Boughton, Gumb...
At-site flood frequency analysis is a useful technique to estimate flood quantiles if reasonably lon...
Due to climate change, floods have been more frequent in recent years. Estimating the flood discharg...
Estimation of probable maximum flood discharges with certain return periods is essential for the des...
Estimation of probable maximum flood discharges with certain return periods is essential for the des...
Flood observations in hydrological data sets contain frequently outliers, and this causes problems f...
Flood frequency analysis is of paramount importance for the design of hydraulic structures, bridges,...
Estimation of probability distribution and return periods of flood peak flows is needed for the plan...
Flood observations in hydrological data sets contain frequently outliers, and this causes problems f...
A frequency analysis of annual instantaneous flood peaks at 117 gauging stations in Turkey (each hav...
ABSTRACT: Prerequisites for deriving satisfactory estimates of design floods are the objective detec...
This study investigates the regional analysis of annual maximum flood series of 48 stream gauging st...
The main goal of this study was to determine regional probability distributions for the annual maxim...
In this study, a regional frequency analysis of the annual maximum series of flood data observed at ...
In the hydraulic structures design process, the reliable flood estimation is essential for designing...
The two-parameter log-normal, three-parameter log-normal, smemax, two-step-power, log-Boughton, Gumb...
At-site flood frequency analysis is a useful technique to estimate flood quantiles if reasonably lon...
Due to climate change, floods have been more frequent in recent years. Estimating the flood discharg...
Estimation of probable maximum flood discharges with certain return periods is essential for the des...
Estimation of probable maximum flood discharges with certain return periods is essential for the des...
Flood observations in hydrological data sets contain frequently outliers, and this causes problems f...
Flood frequency analysis is of paramount importance for the design of hydraulic structures, bridges,...
Estimation of probability distribution and return periods of flood peak flows is needed for the plan...
Flood observations in hydrological data sets contain frequently outliers, and this causes problems f...
A frequency analysis of annual instantaneous flood peaks at 117 gauging stations in Turkey (each hav...
ABSTRACT: Prerequisites for deriving satisfactory estimates of design floods are the objective detec...
This study investigates the regional analysis of annual maximum flood series of 48 stream gauging st...
The main goal of this study was to determine regional probability distributions for the annual maxim...
In this study, a regional frequency analysis of the annual maximum series of flood data observed at ...
In the hydraulic structures design process, the reliable flood estimation is essential for designing...
The two-parameter log-normal, three-parameter log-normal, smemax, two-step-power, log-Boughton, Gumb...
At-site flood frequency analysis is a useful technique to estimate flood quantiles if reasonably lon...
Due to climate change, floods have been more frequent in recent years. Estimating the flood discharg...