ABSTRACT: A Metro Line 1 extension is being executed in Naples from the terminal of Dante Station. The new underground section is composed of five new stations and two twin rail tunnels with a length of 5 km. Toledo Station has the shaft located laterally and a large size service tunnel (13 m wide, 17 m high and 40 m long) connects it to the rail and pedestrian access tunnels, starting from the access shaft. The tunnel is located in the historical centre, under a deeply urbanized area in volcanic soil (loose pozzolana silty sand and tuff) with a hydrostatic head of 27 m. For stabilizing the tunnel crown in loose volcanic soil, it was decided to adopt the Artificial Ground Freezing method among the various options of ground improvement techn...
The paper reports some geotechnical aspects of the design and construction of the San Pasquale Stat...
The construction of a new underground metro line is being undertaken in thehistorical city centre of...
The Line 6 of Naples Underground is part of the underground network system. The paper reports aspect...
ABSTRACT: A Metro Line 1 extension is being executed in Naples from the terminal of Dante Station. T...
Abstract This paper is concerned with the analysis of a 13 m wide, 17 m high and 40 m long servic...
The paper is dedicated to the case history of a 13 m wide, 17 m high and 40 m long service tunnel at...
Within the Metro Line 1 extension project in Napoli (Italy), the service tunnel at Toledo station wa...
The completion of the downtown stretch of Line 1 of the Napoli (Italy) underground involved the cons...
ABSTRACT. The work deals with the design of two tunnels, currently under construction, connecting th...
This paper presents some of the geotechnical aspects of underground railway construction in the urba...
This paper presents some of the geotechnical aspects of underground railway construction in the urba...
This paper presents some of the geotechnical aspects of underground railway construction in the urba...
The new stretch of Metro Line 1 in Naples (Italy) consists of five new stations and two twin rail tu...
The multi-award-winning Toledo station on Metro line 1 in the Spanish quarter of Naples, Italy, has ...
The paper reports some geotechnical aspects of the design and construction of the San Pasquale Stat...
The construction of a new underground metro line is being undertaken in thehistorical city centre of...
The Line 6 of Naples Underground is part of the underground network system. The paper reports aspect...
ABSTRACT: A Metro Line 1 extension is being executed in Naples from the terminal of Dante Station. T...
Abstract This paper is concerned with the analysis of a 13 m wide, 17 m high and 40 m long servic...
The paper is dedicated to the case history of a 13 m wide, 17 m high and 40 m long service tunnel at...
Within the Metro Line 1 extension project in Napoli (Italy), the service tunnel at Toledo station wa...
The completion of the downtown stretch of Line 1 of the Napoli (Italy) underground involved the cons...
ABSTRACT. The work deals with the design of two tunnels, currently under construction, connecting th...
This paper presents some of the geotechnical aspects of underground railway construction in the urba...
This paper presents some of the geotechnical aspects of underground railway construction in the urba...
This paper presents some of the geotechnical aspects of underground railway construction in the urba...
The new stretch of Metro Line 1 in Naples (Italy) consists of five new stations and two twin rail tu...
The multi-award-winning Toledo station on Metro line 1 in the Spanish quarter of Naples, Italy, has ...
The paper reports some geotechnical aspects of the design and construction of the San Pasquale Stat...
The construction of a new underground metro line is being undertaken in thehistorical city centre of...
The Line 6 of Naples Underground is part of the underground network system. The paper reports aspect...