The demand for online shopping has grown tremendously in the last couple of years. Picnic, a major player in the online grocery industry, is struggling to achieve long-term growth within its current operations. Scheduling and planning are key drivers for maintaining operational efficiency. The Fulfilment Centre (FC) and Distribution Centre (DC) costs heavily depend on efficient operations. This research focuses on improving the scheduling process in an e-grocery FC and DC. The main objective of the model is to maximise the quality of the schedule, which is achieved through two lexicographical objectives. First, the make span is minimised to improve efficiency and to calculate the number of employees required to fulfil the workload. The make...
This paper presents a new solution algorithm to solve the resource-constrained project scheduling pr...
This paper investigates the development and application of a simple heuristic to the resource constr...
In this paper, a metaheuristic solution procedure for the Time-Constrained Project Scheduling Proble...
The resource-constrained project scheduling problem (RCPSP) has been extensively investigated during...
International audienceThis paper is concerned with an overview of the Resource-Constrained Project S...
In this paper, to make flexible job shop scheduling problem (FJSP) more realistic, an operational f...
The present day manufacturing industries face the external challenges like changes in market demand,...
This paper presents the use of a heuristic solution method to improve the process of creating a conj...
This paper analyses the current state of research regarding solution methods dealing with resource-c...
In the last few decades the resource-constrained project scheduling problem has become a popular pro...
International audienceThis work introduces a procedure to solve the multi-skill project scheduling p...
In this paper, a metaheuristic solution procedure for the Time-Constrained Project Scheduling Proble...
In project scheduling, a set of precedence-constrained jobs has to be scheduled so as to minimize a ...
Several problems in the domains of project management (PM) and operations research (OR) can be class...
This title presents a large variety of models and algorithms dedicated to the resource-constrained p...
This paper presents a new solution algorithm to solve the resource-constrained project scheduling pr...
This paper investigates the development and application of a simple heuristic to the resource constr...
In this paper, a metaheuristic solution procedure for the Time-Constrained Project Scheduling Proble...
The resource-constrained project scheduling problem (RCPSP) has been extensively investigated during...
International audienceThis paper is concerned with an overview of the Resource-Constrained Project S...
In this paper, to make flexible job shop scheduling problem (FJSP) more realistic, an operational f...
The present day manufacturing industries face the external challenges like changes in market demand,...
This paper presents the use of a heuristic solution method to improve the process of creating a conj...
This paper analyses the current state of research regarding solution methods dealing with resource-c...
In the last few decades the resource-constrained project scheduling problem has become a popular pro...
International audienceThis work introduces a procedure to solve the multi-skill project scheduling p...
In this paper, a metaheuristic solution procedure for the Time-Constrained Project Scheduling Proble...
In project scheduling, a set of precedence-constrained jobs has to be scheduled so as to minimize a ...
Several problems in the domains of project management (PM) and operations research (OR) can be class...
This title presents a large variety of models and algorithms dedicated to the resource-constrained p...
This paper presents a new solution algorithm to solve the resource-constrained project scheduling pr...
This paper investigates the development and application of a simple heuristic to the resource constr...
In this paper, a metaheuristic solution procedure for the Time-Constrained Project Scheduling Proble...