This paper presents a new control model, ideal for teleoperation, which takes into account the problems arising with heavily delayed communicating systems. This is done with the help of a general purpose neural network and a specific dedicated training structure which is able to train the network and to minimize the network errors due to convergence problems. The principal aim of this model is to give more stability to the data flux reducing the uncertainties due to a variable delay present in the communication suppor
A neural-network-based adaptive control scheme is developed for bilateral teleoperation systems with...
The design of control, estimation or diagnosis algorithms most often assumes that all available proc...
The paper presents a technology based on an ensemble of neural networks that solves the problem of p...
This paper presents a new control model, ideal for teleoperation, which takes into account the probl...
This paper studies the model uncertainties of Internet-based bilateral teleoperation systems under a...
A bilateral neural network adaptive controller is designed for a class of teleoperation systems with...
In this paper, a novel neural network (NN)-based four-channel wave-based time domain passivity appro...
In this paper, a novel neural network (NN)-based four-channel wave-based time domain passivity appro...
This paper presents an adaptive teleoperation which is robust to time-delay and environmental uncert...
Abstract: In this paper we explain about the Networked control systems (NCS).NCS are distributed com...
Abstract: This paper proposes a new model for time-delay systems, which contains multiple successive...
In this article, subject to time-varying delay and uncertainties in dynamics, we propose a novel ada...
This paper presents an approach for realtime systems, as hybrid testing, active and semiactive contr...
A new framework is proposed to cope with the uncertain time delay of networked control system. Event...
This paper presents a time-delayed neural network (TDNN) model that has the capability of learning a...
A neural-network-based adaptive control scheme is developed for bilateral teleoperation systems with...
The design of control, estimation or diagnosis algorithms most often assumes that all available proc...
The paper presents a technology based on an ensemble of neural networks that solves the problem of p...
This paper presents a new control model, ideal for teleoperation, which takes into account the probl...
This paper studies the model uncertainties of Internet-based bilateral teleoperation systems under a...
A bilateral neural network adaptive controller is designed for a class of teleoperation systems with...
In this paper, a novel neural network (NN)-based four-channel wave-based time domain passivity appro...
In this paper, a novel neural network (NN)-based four-channel wave-based time domain passivity appro...
This paper presents an adaptive teleoperation which is robust to time-delay and environmental uncert...
Abstract: In this paper we explain about the Networked control systems (NCS).NCS are distributed com...
Abstract: This paper proposes a new model for time-delay systems, which contains multiple successive...
In this article, subject to time-varying delay and uncertainties in dynamics, we propose a novel ada...
This paper presents an approach for realtime systems, as hybrid testing, active and semiactive contr...
A new framework is proposed to cope with the uncertain time delay of networked control system. Event...
This paper presents a time-delayed neural network (TDNN) model that has the capability of learning a...
A neural-network-based adaptive control scheme is developed for bilateral teleoperation systems with...
The design of control, estimation or diagnosis algorithms most often assumes that all available proc...
The paper presents a technology based on an ensemble of neural networks that solves the problem of p...