The current efforts to assure stable, safe and competitive operation of nuclear power plants go together with advances made in accident analysis domain where the deterministic safety analysis is an important instrument for confirming the adequacy and efficiency of provisions for the safety of nuclear power plants. Recently made advances offer two acceptable options for demonstrating that the safety is ensured with sufficient margin: use of best estimate (BE) computer codes either combined with conservative input data or with realistic input data but associated with evaluation of uncertainty of results. The objective, proposed for the present work, is the implementation of the best estimate plus uncertainty (BEPU) method into th...
Within the licensing process of the KWU Atucha II PHWR (Pressurized Heavy Water Reactor), the BEPU (...
The best estimate plus uncertainty is, at the same time, an approach, a procedure and a frame- work ...
The Best Estimate Plus Uncertainty (BEPU) constitutes an approach, a procedure or a framework aimed ...
Abstract: In general, Best Estimate Plus Uncertainty (BEPU) methodology implies application of 'real...
ABSTRACT Safety analysis is of vital importance in the licensing process of a nuclear power plant. H...
Within the licensing process of the Atucha-2 PHWR (Pressurized Heavy Water Reactor) the BEPU (Best E...
The licensing process of a nuclear power plant is motivated by the need to protect humans and the en...
Within the licensing process of the Atucha II PHWR (Pressurized Heavy Water Reactor) the BEPU (Best ...
There are different options on accidents calculation area by combining the use of computer codes and...
Within the licensing process of the Atucha II PHWR (Pressurized Heavy Water Reactor) the BEPU (Best ...
The Best Estimate Plus Uncertainty (BEPU) constitutes an approach or a procedure aimed at making fea...
The Best Estimate Plus Uncertainty (BEPU) constitutes an approach or a procedure aimed at making fea...
The Best Estimate Plus Uncertainty (BEPU) constitutes an approach, a procedure or a framework aimed ...
Within the licensing process of the Atucha II PHWR (Pressurized Heavy Water Reactor) the BEPU (Best ...
Within the licensing process of the KWU Atucha II PHWR (Pressurized Heavy Water Reactor), the BEPU (...
The best estimate plus uncertainty is, at the same time, an approach, a procedure and a frame- work ...
The Best Estimate Plus Uncertainty (BEPU) constitutes an approach, a procedure or a framework aimed ...
Abstract: In general, Best Estimate Plus Uncertainty (BEPU) methodology implies application of 'real...
ABSTRACT Safety analysis is of vital importance in the licensing process of a nuclear power plant. H...
Within the licensing process of the Atucha-2 PHWR (Pressurized Heavy Water Reactor) the BEPU (Best E...
The licensing process of a nuclear power plant is motivated by the need to protect humans and the en...
Within the licensing process of the Atucha II PHWR (Pressurized Heavy Water Reactor) the BEPU (Best ...
There are different options on accidents calculation area by combining the use of computer codes and...
Within the licensing process of the Atucha II PHWR (Pressurized Heavy Water Reactor) the BEPU (Best ...
The Best Estimate Plus Uncertainty (BEPU) constitutes an approach or a procedure aimed at making fea...
The Best Estimate Plus Uncertainty (BEPU) constitutes an approach or a procedure aimed at making fea...
The Best Estimate Plus Uncertainty (BEPU) constitutes an approach, a procedure or a framework aimed ...
Within the licensing process of the Atucha II PHWR (Pressurized Heavy Water Reactor) the BEPU (Best ...
Within the licensing process of the KWU Atucha II PHWR (Pressurized Heavy Water Reactor), the BEPU (...
The best estimate plus uncertainty is, at the same time, an approach, a procedure and a frame- work ...
The Best Estimate Plus Uncertainty (BEPU) constitutes an approach, a procedure or a framework aimed ...