Cycle time minimization in multi-robot manufacturing stations is computationally challenging. This is due to the many aspects that need to be accounted for, including assigning process tasks to robots, specifying robot configurations at tasks, sequencing, planning motions, and coordinating the robots to avoid collisions. Hence, to find good solutions, often some assumptions are made and/or the problem is divided into subproblems—often limiting the set of solutions with the risk of excluding the best ones. In this study, we generalize the completely disjoint solution method that challenges the so-called shortest path assumption, i.e., to let each robot use its shortest collision-free motion between any two configurations, regardless of the o...
Assembly cells, where multiple robots perform sets of tasks, often face the challenge to minimize cy...
Sheet metal assembly is investment intense. Therefore, the equipment needs to be efficiently utilize...
A workcell composed of a workpiece and several welding robots is considered. We are interested in mi...
Cycle time minimization in multi-robot manufacturing stations is computationally challenging. This i...
The automotive industry is moving from mass production towards an individualized production, individ...
The automotive industry is moving from mass production towards an individualized production, in orde...
In this work we study the problem of coordinating robot paths sharing a common environment in order ...
© 2022 IEEE. Personal use of this material is permitted. Permission from IEEE must be obtained for ...
In this paper we present an optimization method for throughput maximization by balancing, sequencing...
In industry, short ramp-up times, product quality, product customization and high production rates a...
When multiple systems work in the same physical environment, it is important to ensure that no colli...
International audienceIndustrial robots are programmed to repeat a sequence of well-defined tasks, e...
Sheet metal assembly is investment intense. Therefore the equipment needs to be efficiently utilized...
This paper presents novel algorithms and visualization tools for avoiding collisions and minimizing ...
This work is inspired by the problem of planning sequences of operations, as welding, in car manufac...
Assembly cells, where multiple robots perform sets of tasks, often face the challenge to minimize cy...
Sheet metal assembly is investment intense. Therefore, the equipment needs to be efficiently utilize...
A workcell composed of a workpiece and several welding robots is considered. We are interested in mi...
Cycle time minimization in multi-robot manufacturing stations is computationally challenging. This i...
The automotive industry is moving from mass production towards an individualized production, individ...
The automotive industry is moving from mass production towards an individualized production, in orde...
In this work we study the problem of coordinating robot paths sharing a common environment in order ...
© 2022 IEEE. Personal use of this material is permitted. Permission from IEEE must be obtained for ...
In this paper we present an optimization method for throughput maximization by balancing, sequencing...
In industry, short ramp-up times, product quality, product customization and high production rates a...
When multiple systems work in the same physical environment, it is important to ensure that no colli...
International audienceIndustrial robots are programmed to repeat a sequence of well-defined tasks, e...
Sheet metal assembly is investment intense. Therefore the equipment needs to be efficiently utilized...
This paper presents novel algorithms and visualization tools for avoiding collisions and minimizing ...
This work is inspired by the problem of planning sequences of operations, as welding, in car manufac...
Assembly cells, where multiple robots perform sets of tasks, often face the challenge to minimize cy...
Sheet metal assembly is investment intense. Therefore, the equipment needs to be efficiently utilize...
A workcell composed of a workpiece and several welding robots is considered. We are interested in mi...