Caption says, "A-850 First concrete placed in left abutment on left side of diversion channel. Masonry in foreground is upstream face of dam.
Caption says, "A-975 Placing concrete in Altus Dam at Elevation 1548, above canal Outletworks.
Caption says, "A-884 Concrete placing activities on right abutment. Concrete buckets are lifted fro...
Caption says, "A-976 Erecting forms and placing concrete in canal outletworks stilling basin at Alt...
Caption says, "A-860 Concrete placed on left abutment to date on both sides of diversion channel. C...
Caption says, "A-868 View of concrete and masonry placing progress on left abutment adjacent to div...
Caption says, "A-824 Placing concrete in large water worn channel in foundation adjacent to downstr...
Caption says, "A-875 Progress of concrete placing on left abutment adjacent to the diversion channe...
Caption says, "A-853 View of partially covered gallery forms taken from left abutment downstream. C...
Caption says, "A-847 General view of concrete placing operations on dam. Fresh concrete is being pl...
Caption says, "A-924 View of progress on concrete placing taken from the right abutment of Altus Da...
Caption says, "A-856 Concrete in spillway portion of dam at Elevation 1488.5 taken from high on lef...
Caption says, "A-823 Closeup view of first concrete placing operations on Altus Dam. Concrete is be...
Caption says, "A-925 View of progress on concrete placing taken from left abutment of Altus Dam. El...
Caption says, "A-855 Concrete in spillway section at Elevation 1488.5 showing blockout for river ou...
Caption says, "A-936 Method used in placing concrete on all abutment sections during final construc...
Caption says, "A-975 Placing concrete in Altus Dam at Elevation 1548, above canal Outletworks.
Caption says, "A-884 Concrete placing activities on right abutment. Concrete buckets are lifted fro...
Caption says, "A-976 Erecting forms and placing concrete in canal outletworks stilling basin at Alt...
Caption says, "A-860 Concrete placed on left abutment to date on both sides of diversion channel. C...
Caption says, "A-868 View of concrete and masonry placing progress on left abutment adjacent to div...
Caption says, "A-824 Placing concrete in large water worn channel in foundation adjacent to downstr...
Caption says, "A-875 Progress of concrete placing on left abutment adjacent to the diversion channe...
Caption says, "A-853 View of partially covered gallery forms taken from left abutment downstream. C...
Caption says, "A-847 General view of concrete placing operations on dam. Fresh concrete is being pl...
Caption says, "A-924 View of progress on concrete placing taken from the right abutment of Altus Da...
Caption says, "A-856 Concrete in spillway portion of dam at Elevation 1488.5 taken from high on lef...
Caption says, "A-823 Closeup view of first concrete placing operations on Altus Dam. Concrete is be...
Caption says, "A-925 View of progress on concrete placing taken from left abutment of Altus Dam. El...
Caption says, "A-855 Concrete in spillway section at Elevation 1488.5 showing blockout for river ou...
Caption says, "A-936 Method used in placing concrete on all abutment sections during final construc...
Caption says, "A-975 Placing concrete in Altus Dam at Elevation 1548, above canal Outletworks.
Caption says, "A-884 Concrete placing activities on right abutment. Concrete buckets are lifted fro...
Caption says, "A-976 Erecting forms and placing concrete in canal outletworks stilling basin at Alt...