Commercially available sag-tension programs give good results for most practical applications. However, they have some limitations concerning gap-type conductors. A separate aluminum and core creep calculation is needed due to the especial structure of gap-type conductors. For the same reason, different core and aluminum lengths have to be considered. In order to take into account the creep during the installation process, flexibility for the consideration of several stages is needed. A method that considers all these characteristics has been developed and implemented in a comprehensive, versatile and flexible sag-tension software tool, called STOC (Strain-Tension in Overhead Conductors). The program has been designed for the analysis of ga...
The majority of design failures are attributed to a confluence of different stresses operating on th...
The high voltage power network in Sweden consists mainly of overhead power lines, that is conductors...
The vibrations of pantograph passing underneath the overhead system can be reduced by using droppers...
Commercially available sag-tension programs give good results for most practical applications. Howev...
The sag and tension values of overhead conductors are influenced by the creep developed during the l...
[EN] Low-sag conductors are characterised by their ability to operate above the "knee-point temperat...
Reconductoring with high temperature low sag (HTLS) conductors is an alternative to the traditional ...
Sag calculation plays an important role in overhead line design. Since the tensile stress of alumini...
PowerTech, 2011 IEEE TrondheimThe paper describes a monitoring system for the evaluation of the low ...
MELECON 2012 - 2012 16th IEEE Mediterranean Electrotechnical Conference, 25 Mar - 28 Mar 2012, Túnez...
Abstract—The ruling span concept is widely used to calculate sags and tensions for new overhead tran...
Accurate calculation of temperature, stress, sag, and critical current (corresponding to critical te...
Calculating of wires sag and tension under various modes is the task of mechanical calculation. The ...
Power transmission is mainly based on overhead transmission lines with conductors being supported by...
Real time monitoring allows the determination of the line state and the calculation of the actual ra...
The majority of design failures are attributed to a confluence of different stresses operating on th...
The high voltage power network in Sweden consists mainly of overhead power lines, that is conductors...
The vibrations of pantograph passing underneath the overhead system can be reduced by using droppers...
Commercially available sag-tension programs give good results for most practical applications. Howev...
The sag and tension values of overhead conductors are influenced by the creep developed during the l...
[EN] Low-sag conductors are characterised by their ability to operate above the "knee-point temperat...
Reconductoring with high temperature low sag (HTLS) conductors is an alternative to the traditional ...
Sag calculation plays an important role in overhead line design. Since the tensile stress of alumini...
PowerTech, 2011 IEEE TrondheimThe paper describes a monitoring system for the evaluation of the low ...
MELECON 2012 - 2012 16th IEEE Mediterranean Electrotechnical Conference, 25 Mar - 28 Mar 2012, Túnez...
Abstract—The ruling span concept is widely used to calculate sags and tensions for new overhead tran...
Accurate calculation of temperature, stress, sag, and critical current (corresponding to critical te...
Calculating of wires sag and tension under various modes is the task of mechanical calculation. The ...
Power transmission is mainly based on overhead transmission lines with conductors being supported by...
Real time monitoring allows the determination of the line state and the calculation of the actual ra...
The majority of design failures are attributed to a confluence of different stresses operating on th...
The high voltage power network in Sweden consists mainly of overhead power lines, that is conductors...
The vibrations of pantograph passing underneath the overhead system can be reduced by using droppers...