The objective of this project is to do failure analysis on the copper tubes for hot water piping system at Resak central processing platform (RCPP).The scope of the study focused on the microstructure analysis of the copper tube. The function of this piping system is to transfer the hot water from water heater (WH 101 and WH 102) to the LQ (living quarters). The use of this hot water is for bathing because the cold condition in the LQ. So, every personnel on platform have choice whether they need cold water or hot water for bathing. Both of these water heaters are operating at 300 kPa @ 700C (44 psi @ 1500F). The Failure Analysis Processes in this project involved microscopic examination, microscopic examination, sample preparation for meta...
A damaged boiler tube removed from the inclined portion of the arch section of the fuel fired furnac...
A damaged boiler tube removed from the inclined portion of the arch section of the fuel fired furnac...
This paper presents failure investigation on the SA210GrC water wall tube by visual Site inspection,...
The main purpose of this project is to study and identify what elements that causes the corrosion of...
This report presents failure analysis on carbon steel SA – 179 heat exchanger tube in petrochemical ...
A study was conducted into the failure of the heat exchanger. Design of the heat exchanger and opera...
The failure of 90/10 cupronickel heat exchanger tubes in hydrogen coolers were seen after few years ...
The aim of this study was to perform life testing and determine the effect of working fluid on the c...
Heat exchanger is one of important equipments used in industry nowadays, especially in petrochemical...
Heater, known as a furnace or fired heater is used to heat the oil which flows through tubes around ...
Boiler�s function is very important, as a place to change water phase from liquid to vapor in elec...
This paper presents an investigation of a steel pipe failure. The pipe was retrieved from a car coo...
The combined cycle power plant (PLTGU) is the second largest percentage of electrical production met...
Heat exchanger is one of important equipments used in industry nowadays, especially in petrochemica...
This paper presents an investigation of a steel pipe failure. The pipe was retrieved from a car cool...
A damaged boiler tube removed from the inclined portion of the arch section of the fuel fired furnac...
A damaged boiler tube removed from the inclined portion of the arch section of the fuel fired furnac...
This paper presents failure investigation on the SA210GrC water wall tube by visual Site inspection,...
The main purpose of this project is to study and identify what elements that causes the corrosion of...
This report presents failure analysis on carbon steel SA – 179 heat exchanger tube in petrochemical ...
A study was conducted into the failure of the heat exchanger. Design of the heat exchanger and opera...
The failure of 90/10 cupronickel heat exchanger tubes in hydrogen coolers were seen after few years ...
The aim of this study was to perform life testing and determine the effect of working fluid on the c...
Heat exchanger is one of important equipments used in industry nowadays, especially in petrochemical...
Heater, known as a furnace or fired heater is used to heat the oil which flows through tubes around ...
Boiler�s function is very important, as a place to change water phase from liquid to vapor in elec...
This paper presents an investigation of a steel pipe failure. The pipe was retrieved from a car coo...
The combined cycle power plant (PLTGU) is the second largest percentage of electrical production met...
Heat exchanger is one of important equipments used in industry nowadays, especially in petrochemica...
This paper presents an investigation of a steel pipe failure. The pipe was retrieved from a car cool...
A damaged boiler tube removed from the inclined portion of the arch section of the fuel fired furnac...
A damaged boiler tube removed from the inclined portion of the arch section of the fuel fired furnac...
This paper presents failure investigation on the SA210GrC water wall tube by visual Site inspection,...