In the hydrologic analysis activities, the Errors in basic hydrological data monitoring in a drainage area of the river will result in data are not correct and lead to the result of planning and management of water resources is not efficient and effective. The errors are usually caused by a number of rainfall stations in the watershed inadequate and dispersal patterns of uneven rainfall stations. The purpose of this study is to obtain the results of the evaluation of the amount of rainfall stations WMO standards based on existing conditions, to determine the comparison between the design flood discharge KaganRodda method and the design flood discharge conditions using the existing station network, and to obtain recommendations amount and l...
The intensity and duration of rainfall will affect the amount of runoff. A proper drainage design is...
Flooding problems in the Sangatta city, especially in the central offices of the rainbowhill that oc...
Structuring and technical planning for the development of a watershed requires analysis of hydrologi...
Rainfall data always use in analytical process. Hydrology analysis need correct base data, base data...
The hydrological component is the main component in planning water infrastructure. The quality and q...
The accuracy of hydrological quality and quantity data is inseparable from the importance of the hyd...
Dalam perencanaan bangunan air, komponen hidrologi merupakan komponen yang penting. Salah satu kompo...
Babak watershed is one of the major watersheds in Lombok with ± 259.166 km watershed area. Babak w...
Ketelitian data hujan yang tidak akurat sering menyebabkan pengelolaan SDA (sumber daya air) tidak b...
Raining is the main component of hydrology process. The quality and quantity ofthe raining data dete...
Kedungsoko River and its tributaries is located in Kediri and Nganjuk district. Kedungsoko river has...
The aim of this research is to get post network of hydrology efficient, effective and can deputize a...
Kualitas dari data dasar yang akan digunakan untuk suatu analisa sungai tergantung dari seberapa jau...
Visually, the drainage that is being reviewed is still in natural conditions, this is one of the rea...
Bogor is a city with a high rainfall. Bogor has the average monthly rainfall of 267.3 mm with an ave...
The intensity and duration of rainfall will affect the amount of runoff. A proper drainage design is...
Flooding problems in the Sangatta city, especially in the central offices of the rainbowhill that oc...
Structuring and technical planning for the development of a watershed requires analysis of hydrologi...
Rainfall data always use in analytical process. Hydrology analysis need correct base data, base data...
The hydrological component is the main component in planning water infrastructure. The quality and q...
The accuracy of hydrological quality and quantity data is inseparable from the importance of the hyd...
Dalam perencanaan bangunan air, komponen hidrologi merupakan komponen yang penting. Salah satu kompo...
Babak watershed is one of the major watersheds in Lombok with ± 259.166 km watershed area. Babak w...
Ketelitian data hujan yang tidak akurat sering menyebabkan pengelolaan SDA (sumber daya air) tidak b...
Raining is the main component of hydrology process. The quality and quantity ofthe raining data dete...
Kedungsoko River and its tributaries is located in Kediri and Nganjuk district. Kedungsoko river has...
The aim of this research is to get post network of hydrology efficient, effective and can deputize a...
Kualitas dari data dasar yang akan digunakan untuk suatu analisa sungai tergantung dari seberapa jau...
Visually, the drainage that is being reviewed is still in natural conditions, this is one of the rea...
Bogor is a city with a high rainfall. Bogor has the average monthly rainfall of 267.3 mm with an ave...
The intensity and duration of rainfall will affect the amount of runoff. A proper drainage design is...
Flooding problems in the Sangatta city, especially in the central offices of the rainbowhill that oc...
Structuring and technical planning for the development of a watershed requires analysis of hydrologi...