Many large-scale construction projects suffer from issuance of construction phase change orders that ultimately leads to significant cost overruns and major scheduling delays. Researchers and practitioners have found complexity, as well as several project characteristics, to be the underlying cause of change orders. Therefore, the aim of this study was to investigate and analyze the impact of a project\u27s level of complexity on the value and number of change orders issued by each of the three primary stakeholders (owner, designer, and contractor) during the construction phase. To fulfill the objectives of this study, a survey questioning about the project characteristics was developed and distributed. After two follow-up emails, 44 comple...
Change orders are very common in almost every construction project nowadays, often resulting in incr...
The aim of this research is to identify the main causes and effects of CCO in the construction of th...
Purpose – Hospital construction projects often suffer from relatively late changes in the project li...
Complexity is very high in construction project and constrained by money and time. Change orders are...
Managing change order is a critical area of concern in the construction industry, owing to the resul...
In construction projects, changes are very common and likely to occur at any stage of the project. M...
In the last ten years there has been huge volume of work in construction industry. This is because o...
AbstractIn construction projects, changes are very common and likely to occur at any stage of the pr...
Change orders occur frequently in most construction projects. Changes occur not only because of erro...
Construction consists of any phase activities in project. Certainly in every phase of work change o...
Construction projects are of very complex nature and come along with an intrinsic but undesirable pr...
"The advancements in the field of project management have driven researchers to take heed of nu...
Effective project management comes from controlling cost, time, and quality on a project. As constru...
Change orders are very common in almost every construction project nowadays, often resulting in incr...
It is a common statement that the construction process is one of the most complex and risky business...
Change orders are very common in almost every construction project nowadays, often resulting in incr...
The aim of this research is to identify the main causes and effects of CCO in the construction of th...
Purpose – Hospital construction projects often suffer from relatively late changes in the project li...
Complexity is very high in construction project and constrained by money and time. Change orders are...
Managing change order is a critical area of concern in the construction industry, owing to the resul...
In construction projects, changes are very common and likely to occur at any stage of the project. M...
In the last ten years there has been huge volume of work in construction industry. This is because o...
AbstractIn construction projects, changes are very common and likely to occur at any stage of the pr...
Change orders occur frequently in most construction projects. Changes occur not only because of erro...
Construction consists of any phase activities in project. Certainly in every phase of work change o...
Construction projects are of very complex nature and come along with an intrinsic but undesirable pr...
"The advancements in the field of project management have driven researchers to take heed of nu...
Effective project management comes from controlling cost, time, and quality on a project. As constru...
Change orders are very common in almost every construction project nowadays, often resulting in incr...
It is a common statement that the construction process is one of the most complex and risky business...
Change orders are very common in almost every construction project nowadays, often resulting in incr...
The aim of this research is to identify the main causes and effects of CCO in the construction of th...
Purpose – Hospital construction projects often suffer from relatively late changes in the project li...