Effective methods for extending the storage capacity of tailings for a mining company include expanding and increasing the height of the tailings dam. However, this change could lead to an uplift in the phreatic line and a decrease in the slope stability. In this paper, a new drainage system combining a horizontal drainage pipe with an upward bending slotted pipe was proposed and applied to the design of a seepage-proof system for the Xigou tailings dam with an increased height. To accurately simulate the performance of the seepage control system, a three-dimensional finite element model was established on the basis of a geological investigation of the site conditions. In this work, a substructure technique was used to model the drainage pi...
A tailings dam, as part of a tailings storage facility, is typically constructed using waste rock or...
Embankment dams, both water Retention Dams (WRD) and tailings dams, are constructed of granular mate...
In this study, a homogeneous section of an earthen dam (Hub dam) with and without cut-off wall was a...
Effective methods for extending the storage capacity of tailings for a mining company include expand...
To better understand the seepage field in tailings dam with a drainage structure that combines drain...
A physical model of earth dam is constructed a drainage and seepage tank in order to analyze the see...
Tailings dams are built to safely store tailings and to protect the natural environment from damage....
It is important to determine the seepage field parameters of a high core rockfill dam using the seep...
One of the major concerns in the behavior of an earth dam is the change in the exit gradient and the...
All dams experience seepage to some degree. While the dam experiencing seepage may appear in sound c...
Earth-fill dams are the most common types of dam and the most economical choice. However, they are m...
The embankment dam has the advantage that it can be built in all sub-base conditions although poor t...
The mining industry produce large amount of mine waste, also called tailings, which must be kept in...
Dam failure involves a huge amount of economic, financial, structural losses as well as loss of nume...
Significant interest has been focused on recovery rates, recovery options, and recovery utilization ...
A tailings dam, as part of a tailings storage facility, is typically constructed using waste rock or...
Embankment dams, both water Retention Dams (WRD) and tailings dams, are constructed of granular mate...
In this study, a homogeneous section of an earthen dam (Hub dam) with and without cut-off wall was a...
Effective methods for extending the storage capacity of tailings for a mining company include expand...
To better understand the seepage field in tailings dam with a drainage structure that combines drain...
A physical model of earth dam is constructed a drainage and seepage tank in order to analyze the see...
Tailings dams are built to safely store tailings and to protect the natural environment from damage....
It is important to determine the seepage field parameters of a high core rockfill dam using the seep...
One of the major concerns in the behavior of an earth dam is the change in the exit gradient and the...
All dams experience seepage to some degree. While the dam experiencing seepage may appear in sound c...
Earth-fill dams are the most common types of dam and the most economical choice. However, they are m...
The embankment dam has the advantage that it can be built in all sub-base conditions although poor t...
The mining industry produce large amount of mine waste, also called tailings, which must be kept in...
Dam failure involves a huge amount of economic, financial, structural losses as well as loss of nume...
Significant interest has been focused on recovery rates, recovery options, and recovery utilization ...
A tailings dam, as part of a tailings storage facility, is typically constructed using waste rock or...
Embankment dams, both water Retention Dams (WRD) and tailings dams, are constructed of granular mate...
In this study, a homogeneous section of an earthen dam (Hub dam) with and without cut-off wall was a...