Strategic mine planning includes different cut-off grade policy depending on economic parameters of mining projects and grade-tonnage distribution of the deposit. Minimizing incorrect classification of ore and waste during grade-tonnage distribution is of critical importance for a mining operation. This article reviews the influence of the ore grade-tonnage distribution over the cut-off grade policy in a given mining operation. In this study, firstly, the interpolation parameters used to characterize the grade-tonnage distribution in the orebody are given. The resulting distribution of ore and waste is used to analyze uncertainty, risk impact, and to justify mine-planning decisions, according to the interpolation technique used and the numb...
Mineral reserve estimation and mining design depend on a precise modeling of the mineralized deposit...
Mineral resource evaluation requires defining grade domains of an ore deposit. Common practice in mi...
In the grade control panel area, when the sampling grid is less than the size of block, the grade is...
© 2016 Elsevier Ltd. In an open pit mining operation, the heterogeneity of the grade-tonnage distrib...
In this study, dynamic cut-off grades and multiple processing streams are used to maximize the value...
Mineral deposits are the main assets for the mining industry. Mineral deposits are estimated based o...
This work evaluates and characterizes the impact of the support size and mining dilution of a block ...
After designing the final range of open pit mines, one of the first essential decisions to be made i...
Abstract Prior to extraction from a mine, a pit is usually divided up into 3-D ‘blocks ’ which conta...
Cut-off grade controls the movement of materials among mining, processing and refining stages of an ...
Cutoff grade specifies the available supply of metallic ore from an open pit mine to the multiple pr...
Conventionally, mining industry relies on a deterministic view, where a unique mine plan is determin...
In any mining operation due to the cut-off grade (economic criteria), materials classify into the or...
Mineral reserve estimation and mining design depend on a precise modeling of the mineralized deposit...
The optimum cut-off grade policy maximizes the net present value (NPV) of an open pit mining operati...
Mineral reserve estimation and mining design depend on a precise modeling of the mineralized deposit...
Mineral resource evaluation requires defining grade domains of an ore deposit. Common practice in mi...
In the grade control panel area, when the sampling grid is less than the size of block, the grade is...
© 2016 Elsevier Ltd. In an open pit mining operation, the heterogeneity of the grade-tonnage distrib...
In this study, dynamic cut-off grades and multiple processing streams are used to maximize the value...
Mineral deposits are the main assets for the mining industry. Mineral deposits are estimated based o...
This work evaluates and characterizes the impact of the support size and mining dilution of a block ...
After designing the final range of open pit mines, one of the first essential decisions to be made i...
Abstract Prior to extraction from a mine, a pit is usually divided up into 3-D ‘blocks ’ which conta...
Cut-off grade controls the movement of materials among mining, processing and refining stages of an ...
Cutoff grade specifies the available supply of metallic ore from an open pit mine to the multiple pr...
Conventionally, mining industry relies on a deterministic view, where a unique mine plan is determin...
In any mining operation due to the cut-off grade (economic criteria), materials classify into the or...
Mineral reserve estimation and mining design depend on a precise modeling of the mineralized deposit...
The optimum cut-off grade policy maximizes the net present value (NPV) of an open pit mining operati...
Mineral reserve estimation and mining design depend on a precise modeling of the mineralized deposit...
Mineral resource evaluation requires defining grade domains of an ore deposit. Common practice in mi...
In the grade control panel area, when the sampling grid is less than the size of block, the grade is...