According to solid waste facility regulations codified in 40 CFR §258.61(b), the 30-year PCC period specified by Subtitle D can be extended or shortened by the governing regulatory agency on a site-specific basis. Post closure care (PCC) activities under Subtitle D include leachate collection and treatment, groundwater monitoring, inspection and maintenance of the final cover, and monitoring to insure that landfill gas does not migrate off site or into on-site buildings. However, quantification of post closure performance of a landfill is difficult since it involves considerations of parameters that include technical factors, environmental considerations, and economic assessment. This paper presents a simple approach for assessing and proje...
Corrective Action Unit (CAU) 424, the Area 3 Landfill Complexes at Tonopah Test Range, consists of e...
SUMMARY: With landfills, which are in operation or already closed, there is the question concerning ...
This study investigates the potential impacts caused by the loss of active environmental control mea...
According to solid waste facility regulations codified in 40 CFR §258.61(b), the 30-year PCC period ...
According to solid waste facility regulations codified in 40 CFR §258.61(b), the 30-year PCC period ...
Subtitle D of the Resource Conservation and Recovery Act (RCRA) requires a post closure period of 30...
Subtitle D of the Resource Conservation and Recovery Act (RCRA) requires a post closure period of 30...
Subtitle D of the Resource Conservation and Recovery Act (RCRA) requires a post closure period of 30...
Management of a landfill is a continuous process that proceeds long after the active landfill period...
Subtitle D of the Resource Conservation and Recovery Act (RCRA) requires a post closure period of 30...
Subtitle D of the Resource Conservation and Recovery Act (RCRA) requires a post closure period of 30...
This study is an evaluation of Post Closure Care (PCC) duration of landfills using performance based...
This study is an evaluation of Post Closure Care (PCC) duration of landfills using performance based...
Corrective Action Unit (CAU) 424, the Area 3 Landfill Complex at Tonopah Test Range, consists of eig...
International audienceEffluent management in the aftercare period is an important topic for landfill...
Corrective Action Unit (CAU) 424, the Area 3 Landfill Complexes at Tonopah Test Range, consists of e...
SUMMARY: With landfills, which are in operation or already closed, there is the question concerning ...
This study investigates the potential impacts caused by the loss of active environmental control mea...
According to solid waste facility regulations codified in 40 CFR §258.61(b), the 30-year PCC period ...
According to solid waste facility regulations codified in 40 CFR §258.61(b), the 30-year PCC period ...
Subtitle D of the Resource Conservation and Recovery Act (RCRA) requires a post closure period of 30...
Subtitle D of the Resource Conservation and Recovery Act (RCRA) requires a post closure period of 30...
Subtitle D of the Resource Conservation and Recovery Act (RCRA) requires a post closure period of 30...
Management of a landfill is a continuous process that proceeds long after the active landfill period...
Subtitle D of the Resource Conservation and Recovery Act (RCRA) requires a post closure period of 30...
Subtitle D of the Resource Conservation and Recovery Act (RCRA) requires a post closure period of 30...
This study is an evaluation of Post Closure Care (PCC) duration of landfills using performance based...
This study is an evaluation of Post Closure Care (PCC) duration of landfills using performance based...
Corrective Action Unit (CAU) 424, the Area 3 Landfill Complex at Tonopah Test Range, consists of eig...
International audienceEffluent management in the aftercare period is an important topic for landfill...
Corrective Action Unit (CAU) 424, the Area 3 Landfill Complexes at Tonopah Test Range, consists of e...
SUMMARY: With landfills, which are in operation or already closed, there is the question concerning ...
This study investigates the potential impacts caused by the loss of active environmental control mea...