The coal mining method at the West Banko Pit 1 North is carried out in an open pit using a shovel-dump truck system. The overburden consists of topsoil and claystone with a strength of 0.2 – 3 MPa. The digging force of the Komatsu PC 2000 excavator is 0.697 MPa, so to optimize the productivity of the excavator, it must be carried out using a Komatsu D375A ripper and blasting. Considering that the pit limit in the west is close to residential buildings, it is necessary to design the mining area to be ripping and the area to be blasted as well as blasting technical design to reduce the impact of ground vibration on slope stability and damage to buildings in residential areas around the mine. Based on the results of the analysis of overburden ...
the paper deals with geotechnical study for optimum slope design of NE- Block of West Bokaro opencas...
Deep-hole blasting operations in opencast mines are always associated with some annoyance to the sur...
This study aims to effectively solve the problem of the destruction of the coal roof and floor overl...
Accurate perception of the key stratum instability can improve the safety of coal mining and also pr...
The paper deals with the geotechnical study and slope stability of the dragline highwall slope at La...
The footwall of the coal seam No. XII/XIV of the coal mine is dipping at 38° to 40°. A long-term sta...
Due to the occurrence of slope failure at Pit A, on both side-wall and low-wall geotechnical study h...
Extraction of thin coal seam and associated overburden using drilling and blasting is a cost expansi...
The pace of developments in underground blasting technology is insignificant in contrast to develop...
One of removal activity in area PT. Berau Coal is overburden removal. This activity preceded loosen...
Under all circumstances "Industrial Blasting" needs to be carried out without inflicting disastrous ...
Far-field peak particle velocity (PPV) measurements were made in the roof while blasting in coal dev...
Solid Energy New Zealand plans to mine a 6 to 10m thick coal seam below the Mt. Augustus and Mt. Fre...
Pre-splitting is the commonly used controlled blasting technique for perimeter control in mining and...
AbstractIn this paper, aiming at the mechanism and regulation of overburden breakage induced by mini...
the paper deals with geotechnical study for optimum slope design of NE- Block of West Bokaro opencas...
Deep-hole blasting operations in opencast mines are always associated with some annoyance to the sur...
This study aims to effectively solve the problem of the destruction of the coal roof and floor overl...
Accurate perception of the key stratum instability can improve the safety of coal mining and also pr...
The paper deals with the geotechnical study and slope stability of the dragline highwall slope at La...
The footwall of the coal seam No. XII/XIV of the coal mine is dipping at 38° to 40°. A long-term sta...
Due to the occurrence of slope failure at Pit A, on both side-wall and low-wall geotechnical study h...
Extraction of thin coal seam and associated overburden using drilling and blasting is a cost expansi...
The pace of developments in underground blasting technology is insignificant in contrast to develop...
One of removal activity in area PT. Berau Coal is overburden removal. This activity preceded loosen...
Under all circumstances "Industrial Blasting" needs to be carried out without inflicting disastrous ...
Far-field peak particle velocity (PPV) measurements were made in the roof while blasting in coal dev...
Solid Energy New Zealand plans to mine a 6 to 10m thick coal seam below the Mt. Augustus and Mt. Fre...
Pre-splitting is the commonly used controlled blasting technique for perimeter control in mining and...
AbstractIn this paper, aiming at the mechanism and regulation of overburden breakage induced by mini...
the paper deals with geotechnical study for optimum slope design of NE- Block of West Bokaro opencas...
Deep-hole blasting operations in opencast mines are always associated with some annoyance to the sur...
This study aims to effectively solve the problem of the destruction of the coal roof and floor overl...