This report provides the structure of a policy minimizing a long term, average, expected, backlog/inventory cost for a fluid model, single machine, single product manufacturing system subject to a failure/repair Markov process, where the failure rate is a piecewise constant function of the production rate. This policy generalizes previous results and confirms several conjectures reported in the literature, providing an interesting insight into the problem
We consider a Markovian, failure prone, single machine, single part-type, fluid flow, manufacturing ...
AbstractA production system is subject to random failure. The system continuously accumulates damage...
Preventive Maintenance (PM) models have traditionally concentrated on utilizing machine ``technical"...
This technical note provides the structure of a policy minimizing a long term, average, expected, ba...
This report provides the structure of a policy minimizing a long term, average, expected, backlog/in...
A single part type, single machine, fluid model manufacturing system is considered. The machine is s...
Abstract: In this paper we consider a failure prone, single part type, single machine manufacturing ...
Bibliography: p. [37]"January 1985.""N.S.F. Grant ECS-8304435" "...U.S. ARO...Contract DAAG-29-84-K0...
International audienceThis article deals with the combined production and maintenance plans for a ma...
In this paper we consider a failure prone, single machine, single part-type, limited inventory, manu...
This paper addresses the optimal control in a failure prone manufacturing system. A discrete-time mo...
We consider a Markovian, failure prone, single machine, single part-type, fluid flow, manufacturing ...
AbstractA production system is subject to random failure. The system continuously accumulates damage...
Preventive Maintenance (PM) models have traditionally concentrated on utilizing machine ``technical"...
This technical note provides the structure of a policy minimizing a long term, average, expected, ba...
This report provides the structure of a policy minimizing a long term, average, expected, backlog/in...
A single part type, single machine, fluid model manufacturing system is considered. The machine is s...
Abstract: In this paper we consider a failure prone, single part type, single machine manufacturing ...
Bibliography: p. [37]"January 1985.""N.S.F. Grant ECS-8304435" "...U.S. ARO...Contract DAAG-29-84-K0...
International audienceThis article deals with the combined production and maintenance plans for a ma...
In this paper we consider a failure prone, single machine, single part-type, limited inventory, manu...
This paper addresses the optimal control in a failure prone manufacturing system. A discrete-time mo...
We consider a Markovian, failure prone, single machine, single part-type, fluid flow, manufacturing ...
AbstractA production system is subject to random failure. The system continuously accumulates damage...
Preventive Maintenance (PM) models have traditionally concentrated on utilizing machine ``technical"...