The main aim of this study was to perform a Life Cycle Assessment (LCA) study of the management and transportation system of materials produced with the separated collection in Baronissi, a town of around 17,000 inhabitants, in the Campania region of Italy. Three scenarios were considered: (1) management scenario 2000-2013; (2) management, internal and external transportation scenario 2013; (3) alternative scenario 2013 (it differs from Scenario 2 for the presence of a composting plant at 10 km far from the town of Baronissi). SimaPro v.8.0.2 was the LCA software tool. The environmental impacts were evaluated in terms of IPCC 2007 GWP 100y, Ecological Footprint and Recipe 2008. For all the impact assessment methods, there was a continuous i...