The EU DEMO Plant Electrical System (PES) main scopes are to supply all the plant electrical loads and to deliver to the Power Transmission Grid (PTG) the net electrical power generated. The studies on the PES during the Pre-Concept Design (PCD) Phase were mainly addressed to understand the possible issues, related to the special features both of the power generated, with respect to a power plant of the same size, and of the power to be supplied to the electrical loads. For this purpose, the approach was to start the design of the different PES components adopting technologies already utilized in fusion experiments and in Nuclear Power Plants (NPP) to verify their applicability and identify possible limits when scaled to the DEMO size and a...
This paper describes the progress of the DEMO Design Activities in Europe and particularly the work ...
The realization of the Divertor Tokamak Test (DTT) facility is one of the key milestones of the Eur...
The European fusion programme is “reactor oriented ” and it is aimed at the successive demonstration...
In the EU DEMOnstration power plant, the Plant Electrical System (PES) is one of the largest systems...
EU-DEMO is a European project, having the ambitious goal to be the first demonstrative power plant b...
The engineering design and R&D of auxiliary heating systems and their sub-systems are a key activiti...
EU-DEMO is a European project for the design and construction of the first nuclear reactor able to p...
A large scale program to develop a conceptual design for a demonstration fusion power plant (DEMO) h...
Towards the middle of the current century, the DEMOnstration power plant, DEMO, will start operating...
This paper describes the status of the pre-conceptual design activities in Europe to advance the tec...
The European Power Plant Conceptual Study (PPCS) has been a study of conceptual designs for commerci...
The EUROfusion Consortium established in 2014 and composed by European Fusion Laboratories, and in p...
In the European fusion roadmap, reliable power handling has been defined as one of the most critical...
This paper describes the progress of the DEMO Design Activities in Europe and particularly the work ...
The realization of the Divertor Tokamak Test (DTT) facility is one of the key milestones of the Eur...
The European fusion programme is “reactor oriented ” and it is aimed at the successive demonstration...
In the EU DEMOnstration power plant, the Plant Electrical System (PES) is one of the largest systems...
EU-DEMO is a European project, having the ambitious goal to be the first demonstrative power plant b...
The engineering design and R&D of auxiliary heating systems and their sub-systems are a key activiti...
EU-DEMO is a European project for the design and construction of the first nuclear reactor able to p...
A large scale program to develop a conceptual design for a demonstration fusion power plant (DEMO) h...
Towards the middle of the current century, the DEMOnstration power plant, DEMO, will start operating...
This paper describes the status of the pre-conceptual design activities in Europe to advance the tec...
The European Power Plant Conceptual Study (PPCS) has been a study of conceptual designs for commerci...
The EUROfusion Consortium established in 2014 and composed by European Fusion Laboratories, and in p...
In the European fusion roadmap, reliable power handling has been defined as one of the most critical...
This paper describes the progress of the DEMO Design Activities in Europe and particularly the work ...
The realization of the Divertor Tokamak Test (DTT) facility is one of the key milestones of the Eur...
The European fusion programme is “reactor oriented ” and it is aimed at the successive demonstration...