International audienceIn France, the MINnD Project aims at extending Building Information Modeling (BIM) capacities to describe infrastructures such as roads, bridges, railways, tunnels and geotechnics. The MINnD working group GT1-5 is dedicated to Geotechnics, especially in an underground infrastructure construction context. Such activity leads to the proposal of a conceptual data model and appropriate vocabularies to describe the geotechnical conditions. Those deliverables contribute to the specification of international standards for openBIM (as part of the buildingSmart International IFC Tunnel project) and in openGIS (Open Geospatial Consortium standards) in connection with existing practices (AFTES recommendation). MINnD GT1-5 then en...
Over the years, the use of Building Information Modelling (BIM) methods has changed the workflows of...
Within the GEOFIT project (Smart Geothermal Systems1), BIM environment has been defined as GeoBIM pl...
[EN] Identifying unforeseen problems in the early stages of the project is one of the main advantage...
International audienceIn France, the MINnD Project aims at extending Building Information Modeling (...
The Building Information Modelling approach started to be implemented recently for the infrastructur...
The Architecture, Engineering, and Construction (AEC) industry has, recently, abandoned the use of t...
The implementation of Building Information Modelling (BIM) methodology in the infrastructure field, ...
Building Information Modeling (BIM) is becoming increasingly important tool in civil engineering bot...
In both the Geo and BIM domains, it is widely acknowledged that the integration of geo-data and BIM-...
Very recently the Building Information Modeling (BIM) design approach has landed in the infrastructu...
AbstractBuilding Information Modelling (BIM) is a relatively new concept to the UK construction indu...
In both the Geo and BIM domains, it is widely acknowledged that the integration of geo-data and BIM-...
ABSTRACT: Defining infrastructural BIM standards is an essential issue to successfully implement BIM...
The infrastructure sector is still looking for a standard system able to exploit the most recent adv...
With the rapid development of infrastructure construction, geotechnical engineering has always been ...
Over the years, the use of Building Information Modelling (BIM) methods has changed the workflows of...
Within the GEOFIT project (Smart Geothermal Systems1), BIM environment has been defined as GeoBIM pl...
[EN] Identifying unforeseen problems in the early stages of the project is one of the main advantage...
International audienceIn France, the MINnD Project aims at extending Building Information Modeling (...
The Building Information Modelling approach started to be implemented recently for the infrastructur...
The Architecture, Engineering, and Construction (AEC) industry has, recently, abandoned the use of t...
The implementation of Building Information Modelling (BIM) methodology in the infrastructure field, ...
Building Information Modeling (BIM) is becoming increasingly important tool in civil engineering bot...
In both the Geo and BIM domains, it is widely acknowledged that the integration of geo-data and BIM-...
Very recently the Building Information Modeling (BIM) design approach has landed in the infrastructu...
AbstractBuilding Information Modelling (BIM) is a relatively new concept to the UK construction indu...
In both the Geo and BIM domains, it is widely acknowledged that the integration of geo-data and BIM-...
ABSTRACT: Defining infrastructural BIM standards is an essential issue to successfully implement BIM...
The infrastructure sector is still looking for a standard system able to exploit the most recent adv...
With the rapid development of infrastructure construction, geotechnical engineering has always been ...
Over the years, the use of Building Information Modelling (BIM) methods has changed the workflows of...
Within the GEOFIT project (Smart Geothermal Systems1), BIM environment has been defined as GeoBIM pl...
[EN] Identifying unforeseen problems in the early stages of the project is one of the main advantage...