The flexible manufacturing system (FMS) considered in this paper is composed of two CNC machines working in series—a punching machine and a bending machine connected through rollers acting as a buffer system of finite capacity. The main difference between the present problem and the standard two-machine flow shop problem with finite intermediate capacity is precisely the buffer system, which in our problem consists of two stacks of parts supported by rollers: the first stack contains the output of the punching machine, while the second stack contains the input for the bending machine. When the second stack is empty, the first stack may be moved over. Furthermore, the capacity of each stack depends on the particular part type being processed...
© 2018 Elsevier Ltd This study considers the manufacturing environments in which m+1 machines are co...
In this study, we deal with the robotic cell scheduling problem with two machines and identical part...
Bibliography: leaf 71.Research supported by NSF Grants DAR78-17826 and NSF/RANN APR76-12036.K. L. Hi...
The flexible manufacturing system (FMS) considered in this paper is composed of two CNC machines wor...
This thesis covers a variety of inter-related scheduling and layout issues encountered inflexible ma...
We consider a two-machine flowshop scheduling problem with identical jobs. Each of these jobs has th...
This dissertation addresses three problems which arise during the real-time scheduling of a flexible...
This study addresses loading and scheduling for flexible manufacturing systems with controllable pro...
This paper considers the loading problem for flexible manufacturing systems with partially grouped m...
A scheduling system is proposed and developed for a special type of flow shop. Ln this flow shop the...
In this paper we examine the issue of tool management in a flexible manufacturing cell. The type of ...
A flexible manufacturing system (FMS) is an automated, batch manufacturing system consisting of a se...
This paper exploits the interactions between the machine scheduling and the scheduling of Material H...
AbstractThis paper addresses scheduling n jobs in a two-machine flow shop to minimize the total comp...
This paper addresses scheduling n jobs in a two-machine flow shop to minimize the total completion t...
© 2018 Elsevier Ltd This study considers the manufacturing environments in which m+1 machines are co...
In this study, we deal with the robotic cell scheduling problem with two machines and identical part...
Bibliography: leaf 71.Research supported by NSF Grants DAR78-17826 and NSF/RANN APR76-12036.K. L. Hi...
The flexible manufacturing system (FMS) considered in this paper is composed of two CNC machines wor...
This thesis covers a variety of inter-related scheduling and layout issues encountered inflexible ma...
We consider a two-machine flowshop scheduling problem with identical jobs. Each of these jobs has th...
This dissertation addresses three problems which arise during the real-time scheduling of a flexible...
This study addresses loading and scheduling for flexible manufacturing systems with controllable pro...
This paper considers the loading problem for flexible manufacturing systems with partially grouped m...
A scheduling system is proposed and developed for a special type of flow shop. Ln this flow shop the...
In this paper we examine the issue of tool management in a flexible manufacturing cell. The type of ...
A flexible manufacturing system (FMS) is an automated, batch manufacturing system consisting of a se...
This paper exploits the interactions between the machine scheduling and the scheduling of Material H...
AbstractThis paper addresses scheduling n jobs in a two-machine flow shop to minimize the total comp...
This paper addresses scheduling n jobs in a two-machine flow shop to minimize the total completion t...
© 2018 Elsevier Ltd This study considers the manufacturing environments in which m+1 machines are co...
In this study, we deal with the robotic cell scheduling problem with two machines and identical part...
Bibliography: leaf 71.Research supported by NSF Grants DAR78-17826 and NSF/RANN APR76-12036.K. L. Hi...