Photograph of an erosion control dam. Active gully in the background will be stabilized by the erosion control dam and kept from entering Class I, II and III land. 12 inch Hel-Cor pipe used for the main spill. 380 DA with 4 surface acres and 12 acre-feet of the flood pool. Frank Heldermon and Baker Eeds in the picture. OK-1451-5
Photograph of Permanent Pool # 23 acre surface area taking 1.6 inches of runoff. Flood poll 77 acre ...
Photograph of a pasture gully in a natural draw. Runoff water has been eliminated from the channel b...
Photograph of erosion control. Front slope of a dam at Site # 22 on the Big Wewoka Creek watershed. ...
Photograph of an erosion control dam. A community project. Looking west at gully eating back into cr...
Photograph of a valve and entrance pipe installed in a dam built as an irrigation reservoir under th...
Photograph of a gully plug with pipe in the process of construction under private contract in flood ...
Photograph of 4 of a series of 6. Reservoir constructed for a fourfold purpose. Stockwater, irrigati...
Photograph of a view of a principal spillway in operation. Twelve acre lake with 30 acre-feet flood ...
Photograph of a view of a principal spillway in operation. Twelve acre lake with 30 acre-feet flood ...
Photograph of a drawdown pipe and drain valve in an irrigation resevoir constructed under the Great ...
Photograph of erosion. The gully was caused by plowing furrows to divert water from cultivated land....
Photograph of an area above erosion control dam. A follow-up of OK-1584-6. OK-1584-6
Photograph of erosion on the east end of the dam and east bank of the site, looking north from the e...
Photograph of the gully shaping below the concrete chute spillway. To be sodded to bermuda grass. OK...
Photograph of a gully after shaping. A follow-up of OK-1584-12. Area to be sodded to bermuda grass a...
Photograph of Permanent Pool # 23 acre surface area taking 1.6 inches of runoff. Flood poll 77 acre ...
Photograph of a pasture gully in a natural draw. Runoff water has been eliminated from the channel b...
Photograph of erosion control. Front slope of a dam at Site # 22 on the Big Wewoka Creek watershed. ...
Photograph of an erosion control dam. A community project. Looking west at gully eating back into cr...
Photograph of a valve and entrance pipe installed in a dam built as an irrigation reservoir under th...
Photograph of a gully plug with pipe in the process of construction under private contract in flood ...
Photograph of 4 of a series of 6. Reservoir constructed for a fourfold purpose. Stockwater, irrigati...
Photograph of a view of a principal spillway in operation. Twelve acre lake with 30 acre-feet flood ...
Photograph of a view of a principal spillway in operation. Twelve acre lake with 30 acre-feet flood ...
Photograph of a drawdown pipe and drain valve in an irrigation resevoir constructed under the Great ...
Photograph of erosion. The gully was caused by plowing furrows to divert water from cultivated land....
Photograph of an area above erosion control dam. A follow-up of OK-1584-6. OK-1584-6
Photograph of erosion on the east end of the dam and east bank of the site, looking north from the e...
Photograph of the gully shaping below the concrete chute spillway. To be sodded to bermuda grass. OK...
Photograph of a gully after shaping. A follow-up of OK-1584-12. Area to be sodded to bermuda grass a...
Photograph of Permanent Pool # 23 acre surface area taking 1.6 inches of runoff. Flood poll 77 acre ...
Photograph of a pasture gully in a natural draw. Runoff water has been eliminated from the channel b...
Photograph of erosion control. Front slope of a dam at Site # 22 on the Big Wewoka Creek watershed. ...