Photograph of pier discharge. A view of alfalfa fields below Site 26 while the pipe is discharging. The structure above the field has a large storage of water because of 8 inches of rain that occurred on August 19, 1961. OK-1438-5
Photograph of flooding. Floodwater from a 3.5 inch rain 18 to 30 hours prior to the photo's taking. ...
Photograph of an area above erosion control dam. A follow-up of OK-1584-6. OK-1584-6
Photograph of a W.F. Project [Water & Flood Project?]. Irrigation head gate at concrete diversion da...
Photograph of pipe discharge. View of alfalfa field below Site 26, Calvary watershed after flood sto...
Photograph of a waterway. An alfalfa waterway built in 1952 and established in alfalfa in the fall o...
Photograph of flood water damage. Sonny Flack, operator, surveying the damage done to freshly cut al...
Photograph of flood water damage. Turning bay with a pitch fork in order to dry it out before removi...
Photograph of flood damage. Pot holes in cultivated field from water overflowing an old drainage dit...
Photograph of erosion caused by heavy rains in June. The field will be terraced and contoured farmed...
Photograph of flood storage. Flood storage in Site # 25, Calvary Watershed. This site has a drainage...
Photograph of the principal spillway, Site # 26, Cavalry Creek. View of the permanent pool area afte...
Photograph of grassed channel, Site 29, Cavalry Watershed above this channel has approximately 117 a...
Photograph of the damage done by a 3 inch rain and heavy wind to steep slope that had been seeded to...
Photograph of an erosion control dam constructed in approximately 300 acre drainage area and protect...
Photograph of from the Whitegrass Waterhole Project, Flood Control Structure # 3. Looking west from ...
Photograph of flooding. Floodwater from a 3.5 inch rain 18 to 30 hours prior to the photo's taking. ...
Photograph of an area above erosion control dam. A follow-up of OK-1584-6. OK-1584-6
Photograph of a W.F. Project [Water & Flood Project?]. Irrigation head gate at concrete diversion da...
Photograph of pipe discharge. View of alfalfa field below Site 26, Calvary watershed after flood sto...
Photograph of a waterway. An alfalfa waterway built in 1952 and established in alfalfa in the fall o...
Photograph of flood water damage. Sonny Flack, operator, surveying the damage done to freshly cut al...
Photograph of flood water damage. Turning bay with a pitch fork in order to dry it out before removi...
Photograph of flood damage. Pot holes in cultivated field from water overflowing an old drainage dit...
Photograph of erosion caused by heavy rains in June. The field will be terraced and contoured farmed...
Photograph of flood storage. Flood storage in Site # 25, Calvary Watershed. This site has a drainage...
Photograph of the principal spillway, Site # 26, Cavalry Creek. View of the permanent pool area afte...
Photograph of grassed channel, Site 29, Cavalry Watershed above this channel has approximately 117 a...
Photograph of the damage done by a 3 inch rain and heavy wind to steep slope that had been seeded to...
Photograph of an erosion control dam constructed in approximately 300 acre drainage area and protect...
Photograph of from the Whitegrass Waterhole Project, Flood Control Structure # 3. Looking west from ...
Photograph of flooding. Floodwater from a 3.5 inch rain 18 to 30 hours prior to the photo's taking. ...
Photograph of an area above erosion control dam. A follow-up of OK-1584-6. OK-1584-6
Photograph of a W.F. Project [Water & Flood Project?]. Irrigation head gate at concrete diversion da...